3 floors · 2 apartments · 3,000 sq ft · built 1924 · class S2 · owner of record: Ralph Ciaravalli Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-08-18 (Accepted). Agency page | Dec 31, 2026 in 66 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 29, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39107753H AS OF 7/29/2026., FILE A CERTIFICATE #39198143R | Oct 14, 2026 DEFAULT | $1,280 |
| Jul 29, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39107754J NO PERMIT ON FILE AS OF 7/29/2026., COMPLY WITH COMMISSIONER'S ORDER #39198138M | Oct 14, 2026 DEFAULT | $2,530 |
| May 9, 2025 | Construction CLASS - 1 WORK AGAINST ACTIVE SWO; PARTIAL SWO ISSUED UNDER COMPLAINT 3948736 STATED THAT COMMERCIAL SPACE WAS IN PROCESS OF BEING DEMOED. AS OF 5/9/25 ALL WORK INCLUDING GC, ELECTRIC, PLUMBING, AND GAS HAS BEEN 100% COM #39147552H | Jul 16, 2025 DEFAULT | $25,000 |
| May 9, 2025 | Construction CLASS - 2 BOX SIGN READING 'ADOBO MEXICAN GRILL" HAS BEEN INSTALLED AT EXPOSURE 1 COMPLETE WITH ELECTRIC. STORE FRONT HAS ALSO BEEN MODIFIED REMOVING 6 ARCH WINDOWS AND REPLACING THEM WITH ENTRY DOOR ON RIGHT SIDE AND 2 #39147558Z | Jul 16, 2025 DEFAULT | $6,250 |
| May 9, 2025 | Construction CLASS - 1 NO CERTIFICATE OF CORRECTION ON FILE AS PER REQUEST OF COMMISSIONER FOR CLASS 1 WORK WITHOUT A PERMIT VIOLATION 39107754J ISSUED ON 3/5/24 FOR UNPERMITTED DEMO IN COMMERCIAL SPACE, SWO STILL IN EFFECT, HOWEVER #39147545J | Jul 16, 2025 DEFAULT | $12,500 |
| May 9, 2025 | Construction CLASS - 2 NO CERTIFICATE OF CORRECTION ON FILE AS PER REQUEST OF COMMISSIONER FOR CLASS 1 REMOVAL OF FIRE STOPPING VIOLATION ISSUED ON 3/5/24 FOR REMOVAL OF FIRE STOPPING IN COMMERCIAL SPACE, ENDANGERING THE LIVES OF TEN #39147546L | Jul 16, 2025 DEFAULT | $6,250 |
| May 9, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; OBSERVED COMMERCIAL COOKING EQUIPMENT (FRYER, STOVE) INSTALLED AND IN USE NOT IN COMPLIANCE WITH NYCBC. RESIDENTIAL FLEX GAS LINES ARE CONNECTED TO COMMERC #39147553J | Jul 16, 2025 DEFAULT | $12,500 |
| Mar 5, 2024 | Construction CLASS - 1 WORK WITHOUT A PERMIT AT 1ST FLOOR COMMERCIAL SPACE WITH DEMOLITION OF WALLS AND CEILING COMPROMISE FIREPROOF TOWARD 2ND FLOOR TENANTS. ELECTRICAL WIRES EXPOSED AND LOOSE. NO RECORDS OF PERMITS AT TIME OF INSPE #39107754J | May 15, 2024 DEFAULT | $12,500 |
| Mar 5, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3: 27-345 AT FIRST FLOOR COMMERCIAL SPACE DEMOLITION ON WALL AND CEILING EXPOSED STRUCTURE AND COMPROMISING FIRE STOPPING EXPOSING #39107753H | May 15, 2024 DEFAULT | $0 |
| Oct 16, 2018 | Construction CLASS - 2 WORK W/OA PERMIT:FRONT FACADE BUSINESS ACCESSORY SIGNS APPROX 20'*3' READS "THE HIDEOUT BAYRIDGE" ILLUMINATED INSTALLED W/O A PERMIT.REM: OBTAIN ALL REQUIRED PERMITS #35361794M | Apr 3, 2019 DEFAULT | $6,250 |
| Oct 29, 2016 | Construction CLASS - 1 OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT CERTIFCATE OF OPERTION.AT TIME OR INSPETION PREMISES CONDUCTING BUISNESS AS A PLACE OF ASSEMBLY WT APPROXIMATELY 80 PATRONS PRESENT.PA PERMIT #1150 FOR 115 PER #35212985X | May 10, 2017 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #09038 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 29, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39107753H AS OF 7/29/2026., FILE A CERTIFICATE | Open |
| Jul 29, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39107754J NO PERMIT ON FILE AS OF 7/29/2026., COMPLY WITH COMMISSIONER'S ORDER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)