Brooklyn · Block 6025 · Lot 32 · 11209

8402 4 Avenue

4 floors · 39 apartments · 36,000 sq ft · built 1923 · class C1 · owner of record: Perthori Realty Inc

14open violations
$0ECB/OATH penalties owed
7HPD class C (immediately hazardous)
68dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-07-15 (Accepted). Agency page

Dec 31, 2026
in 68 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 36,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 312 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (14) · C 7 · B 5 · A 2
IssuedClassViolationCorrect by
Sep 23, 2026AApt B1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AT DOOR IN THE ENTRANCE LOCATED AT APT B1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHDec 27, 2026
Mar 4, 2026CApt B9 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, WEST WALL IN THE FOYER LOCATED AT APT B9, 2nd STORY, 2nd APARTMENT FROM NOApr 11, 2026
Mar 4, 2026CApt B9 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT B9, 2nd STORY, 2nd APARTMApr 11, 2026
Mar 4, 2026BApt B9 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT B9, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 8, 2026
Mar 4, 2026BApt B9 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY THE METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT B9, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 8, 2026
Mar 4, 2026CApt B9 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED ATApr 11, 2026
Mar 4, 2026CApt B9 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EApr 11, 2026
Mar 4, 2026BApt B9 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT B9, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 8, 2026
Mar 4, 2026BApt B9 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT B9, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 8, 2026
Mar 4, 2026BApt B9 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT B9, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 8, 2026
Mar 4, 2026CApt B9 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SApr 11, 2026
Nov 21, 2025CApt D6 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT D6, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 5, 2025
Jul 23, 2024CApt B1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERBALANCES AT LOWER SASH FIRE ESCAPE WINDOW 1ST FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT B1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''Jul 29, 2024
Aug 19, 2008A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WINDOWS SEALED WITH BRICK AT ALL STYS AT FRONT NORTH ENTRANCE TO BUILDING.Nov 22, 2008

Issued in the last 120 days

DateSourceWhatNow
Sep 23, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AT DOOR IN THE ENTRANCE LOCATED AT APT B1, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 8:58 PM ET. BBL 3060250032.

Look up another building