4 floors · 106,195 sq ft · built 2002 · class W1 · owner of record: Nyc School Construction Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 106,195 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9177). Agency page | Dec 31, 2027 in 431 days | Next due 2027 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-25 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 25, 2026 | Construction CLASS - 2 REISSUE#35679013K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED:AT CELLAR LEVEL HOLES LEFTOPEN IN GAS METER ROOM AND IN ELECTRICAL METER ROOM.REM:PROVIDE/MAINTA #35729021N | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 25, 2026 | Construction CLASS - 2 REISSUE#35691857M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT THE CELLAR LEVEL BOILER ROOM WATER LEAKING THROUGH FOUNDATION WALL ONTO ELECTRICAL JUNCTION BOX ON THE WALL BEHIND BOILERS.REM:RE #35729020L | Mar 12, 2026 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 REISSUE#35679011R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT CELLAR LEVEL BOILER ROOM,WATER LEAKING PIPE THROUGH FOUNDATION WALL & ONTO ELECTRICAL JUNCTION BOX ON THE WALL(BEHIND BOILERS).RE #35691857M | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 21, 2025 | Construction CLASS - 2 REISSUE#35679012L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED ROOF SURFACE WATERPROOF MEMBRANE BUILDING UP.PENTHOUSE WALL PANEL SYSTEM HAS GASKETS STARTING TO COME OUT BETWEEN SEAMS & WALL PANEL #35691856K | Jul 8, 2025 POP/IN-VIO | $0 |
| Apr 9, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712;27-345. CELLAR LEVEL HOLES LEFT OPEN IN GAS METER ROOM AND IN ELECTRICAL METER ROOM. REMEDY: PROVIDE/MAINTAIN FIRE STOPPING. #35679013K | Sep 27, 2024 POP/IN-VIO | $0 |
| Apr 9, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ROOF LEVEL LAYERS OF ROOF BUBBLING UP LAYERS SEPARATING, PANEL SYSTEM AROUND PENTHOUSE AREA BOTH SIDES OF ROOF GASKETS STARTING TO COME OUT BETWEEN SEAMS O #35679012Z | Sep 27, 2024 POP/IN-VIO | $0 |
| Apr 9, 2024 | Construction CLASS - 2 REISSUE: 35473300J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. CELLAR LEVEL IN BOILER ROOM WATER COMING THRU PIPES INTO ELECTRICAL JUNCTION BOX ONTO WALL. REMEDY: REPAIR AND/OR REPLACE. #35679011R | Sep 27, 2024 POP/IN-VIO | $0 |
| Mar 14, 2023 | Construction CLASS - 2 REISSUE #35548114J(2/16/21) FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AT CELLAR LEVEL IN BOILER RM WATER INFILTRATION THROUGH WALL FROM CONDUITS PIPES FOR ELECTRICAL TO JUNCTION BOX ONTO WALLS & FLO #35473300J | Jul 11, 2023 POP/IN-VIO | $0 |
| Dec 20, 2021 | Boilers CLASS - 2 MISSING GLASS IN REAR OF BOILER,WISKA SWITCH FOR COMBUSTION AIR MISSING,EXPOSED WIRES,BOLT & DOG MISSING ON REAR DOOR #39053165K | Jan 12, 2022 POP/IN-VIO | $0 |
| Feb 16, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTE IN BOILERRM,BACK WALL BEHIND BOILER HAS WATER PENETRATING THRU WALL&APPEARS TO COME FROM JUNCTION BOX UNDER STORM DRAIN.REPAIR &/OR REPLACE&WATERPROOF WALL #35548114J | May 25, 2021 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 7:14 PM ET. BBL 4091770023.