6 floors · 48 apartments · 46,200 sq ft · built 1931 · class D7 · owner of record: 84-06 109th Street
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-17 (Accepted). Agency page | Dec 31, 2026 in 61 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 2, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35475446L ISSUED ON 09/16/20 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT PERMIT AT CELLAR #35533917L | Mar 15, 2022 IN VIOLATION | $0 |
| Jul 29, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35475446L ISSUED9/16/20 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.FOR B101:WORK W/O PERMIT...@CELLAR LEVEL COMPLY W/COMMISSIONER'S ORDER &/OR FI #35534692Y | Mar 15, 2022 IN VIOLATION | $0 |
| Jun 18, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35475446L ISSUED ON 9/16/2020 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT C #35531420R | Sep 7, 2021 IN VIOLATION | $0 |
| Apr 27, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35475446L ISSUED ON 09/16/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O PERMIT. REMEDY: COMPLY W/COMM'S ORDER #35530205J | Jul 20, 2021 IN VIOLATION | $0 |
| Feb 25, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35475446L ISSUED ON 9/16/2020 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT PERMIT.REM #35527764Z | May 18, 2021 IN VIOLATION | $0 |
| Sep 16, 2020 | Construction CLASS - 1 WORK W/O A PERMIT. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT AT CELLAR LEVEL A 3 PCS BATHROOM(TOILET,SHOWER AND VANITY) INSTALLED W/O APERMIT. NEW WATER AND WASTE LINE W/ NEW SWITCH AND OUTLET FOR BATHROOM #35475446L | Mar 16, 2021 IN VIOLATION | $0 |
| Nov 2, 2005 | Construction Hazardous FAILURE TO MAINTAIN. DEFECT NOTED: AT 2ND FLOOR LEVEL APT 9B AND 8B BOTH HAVE FLOORS LANTING ABOUT 2 INCH THE BATHROOM HAVE FAUCETS THAT LEAK AND THE EDGES OF THE BATHTUB ARE POUROUS WHERE WATER SEIPS INTO THE #34500668M | Oct 17, 2006 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 28, 2021 | ELEVATOR #9027/713607 | DOB VIOLATION - ACTIVE |
| Sep 16, 2020 | CONSTRUCTION WORK WITHOUT A PERMIT #CERSM02 | DOB VIOLATION - ACTIVE |
| Aug 10, 2020 | ELEVATOR #9027/686017 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #15121 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03988 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 22, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET, 6th STORY, SECTION AT EAST | Feb 5, 2026 |
| Jan 8, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT COMPACTOR CLOSET AT PUBLIC HALL, 6th STORY | Jan 22, 2026 |
| Dec 11, 2025 | B | Apt 9F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 9F, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jan 15, 2026 |
| Oct 14, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR LEADING TO PUBLIC HALL , 1st STORY | Oct 20, 2025 |
| Sep 11, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 4th STORY | Sep 25, 2025 |
| Sep 8, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT COMPACTOR DOOR AT COMPACTOR CLOSET, 4th STORY | Sep 22, 2025 |
| Dec 2, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET, 2nd STORY | Dec 16, 2024 |
| Nov 18, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AND FRAME AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 4th STORY | Dec 2, 2024 |
| Nov 18, 2024 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Dec 23, 2024 |
| Nov 18, 2024 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Dec 23, 2024 |
| Oct 29, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 3rd STORY | Nov 12, 2024 |
| Oct 29, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 4th STORY | Nov 12, 2024 |
| Mar 27, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH ASSEMBLY SET AT BUILDING FRONT ENTRANCE DOOR LEADING TO VESTIBULE AT PUBLIC HALL, 1st STORY | May 1, 2024 |
| Dec 26, 2023 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY | Mar 30, 2024 |
| Oct 30, 2023 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AT COMPACTOR CLOSET, 4th STORY | Nov 13, 2023 |
| Oct 30, 2023 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AT COMPACTOR CLOSET, 5th STORY | Nov 13, 2023 |
| Jan 20, 2023 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH AND EAST WALL APPROX 2 SQUARE FEET IN THE BATHROOM LOCATED AT APT 4B, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 15376957 ISSUED 20-SEP-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE | Feb 24, 2023 |
| Jul 12, 2021 | A | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT REAR FIRE ESCAPE OF THE BUILDING | Oct 15, 2021 |
| May 14, 2021 | C | Apt 9F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Jun 9, 2021 |
| May 14, 2021 | C | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HOPPER DOORS AT COMPACTOR CLOSET | Jun 9, 2021 |
| Nov 13, 2019 | C | Apt 8B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 8B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Dec 4, 2019 |
| Jan 10, 2018 | B | Apt 9D · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER SASH; COUNTER BALANCE AT FIRST WINDOW FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 9D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 14, 2018 |
| Dec 8, 2017 | B | Apt 3C · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOMMUNICATION SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, APARTMENT AT SOUTH | Jan 12, 2018 |
| Dec 8, 2017 | B | Apt 3C · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, APARTMENT AT SOUTH | Jan 12, 2018 |
| Sep 7, 2017 | B | Apt 8E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PORCELAIN AT BATHTUB IN THE BATHROOM LOCATED AT APT 8E, 5th STORY | Oct 12, 2017 |
| Mar 26, 2015 | B | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HOPPER DOORS AT COMPACTOR CLOSETS ALL STY AT PUBLIC HALL | Apr 30, 2015 |
| May 14, 2009 | B | Apt 3C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 18, 2009 |
| Feb 3, 2003 | B | Apt 3E · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER AT CIRCUIT BRAKER BOX IN THE KITCHEN LOCATED AT APT 3E, 5th STORY | Mar 15, 2003 |
| Jul 29, 1997 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT METAL TREADS HANDRAILS RETURN RAILS LANDINGS 1 TO 6 STY BALCONY NORTH SOUTH EAST AND WEST STACKS. | Nov 14, 1997 |
| Jul 29, 1997 | A | § 27-2005 ADM CODE REFIT 5 STY PUB HALL COMPACTOR ROOM. | Nov 14, 1997 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 11:26 PM ET. BBL 4091940007.