Staten Island · Block 610 · Lot 7501 · 10301

830 Howard Avenue

6 floors · 66 apartments · 56,375 sq ft · built 1981 · class R4 · owner of record: Highview Condo I

22open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 56,375 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 777 days
Next cycle year 2028
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 610). Agency page

Dec 31, 2030
in 1507 days
Next due 2030
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-04 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Dec 4, 2020Construction CLASS - 2
BC 3314.3.3 DRAWINGS. AT THE TIME OF INSPECTION ACTIVE JOB SITE,FACADEREPAIR IN PROGRESS. I OBSERVED C-HOOK SUSPENDED SCAFFOLDS INSTALLED ATEXP#3 FOR FACADE REPAIR OPERATION. UPON REQUEST TO SEE DESIGN DRAWINGS
#35509522R
Apr 7, 2021
IN VIOLATION
$0
Dec 4, 2020Construction CLASS - 2
FAILURE TO INSTITUTE AND MAINTAIN ALL SAFETY MEASURES. AT THE TIME OF INSPECTION ACTIVE JOB SITE,FACADE REPAIR IN PROGRESS. I OBSERVED INADEQUATE OVERHEAD PROTECTION AT EXP#1,2 AND 4,AND NO OHP AT EXP#3(NO CONT
#35509520N
Apr 14, 2021
IN VIOLATION
$0
DOB (7)
IssuedViolationStatus
Dec 12, 2025CONSTRUCTION
STRUCTURE RENDERING NON-COMPLIANT. AT UNIT 7C, THERE ARE CEILING CRACKS AND NAILS PUNCTURES AT SEVERAL LOCATIONS WITHIN THE CONDOMINIUM. UNIT 7C IS THE LAST FLOOR OF THE BUILDING. UPON INSPECTION, BUILDING HAS A PERMIT TO DO SOLAR PANELS AT ROOF LEVEL (PERMIT # S01101664).
#25-03124
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#18317
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#28909
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00529
DOB VIOLATION - ACTIVE
Aug 30, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
#01936
DOB VIOLATION - ACTIVE
Nov 30, 2007LOCAL LAW 11/98 - FACADE

#NRF46896
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#26848
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Aug 30, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Active
Nov 30, 2007Facades LL1198
CYCLE 6 NO REPORT FILED
Active
Jan 31, 2005Boiler LL6291
Active
Jun 4, 1993Boiler LL6291
Active
HPD (4) · C 1 · B 3 · A 0
IssuedClassViolationCorrect by
Jan 28, 2026BApt 4H · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMar 4, 2026
Jan 28, 2026BApt 4H · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT ENTRANCE DOOR TO ROOM WITH FIRE ESCAPE IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMar 4, 2026
Jan 28, 2026BApt 4H · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUMar 4, 2026
Mar 13, 2023CApt 7F · § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR .. IN THE ENTRANCE LOCATED AT APT 7F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMar 19, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 9:55 PM ET. BBL 5006107501.