2 floors · 4 apartments · 3,600 sq ft · built 1930 · class C3 · owner of record: Bahumi, Yonatan
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 6, 2026 | Construction CLASS - 2 CONTRARY TO DOB/OFFICIAL RECORDS - EXPOSURE 4/RIGHT SIDE YARD WAS OBSERVED CREATED & USED AS AN ACTIVE DRIVEWAY (4 VEHICLES OBSERVED PARKED) WITH UNCUT CURB PAINTED YELLOW & SIGNAGE AFFIXED TO GATE INDICATING P #39183454M | Sep 25, 2026 DEFAULT | $1,280 |
| Mar 6, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39143675J., FILE A CERTIFICATE OF CORRECTION #39179486P | May 15, 2026 DEFAULT | $6,250 |
| Apr 1, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. NOTED: AT TIME OF INSPECTION - 1. OBSERVED EXCESSIVE VOLUME OF GARBAGE AND DEBRIS ACCUMULATED AT EXPOSURE'S 1 AND 4: CREATING HEALTH HAZARD CONDITIONS, 2. #39143675J | Sep 26, 2025 IN VIOLATION | $2,500 |
| Apr 1, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTED: FULL HEIGHT PARTITION WALLS AND CELLAR METAL STUDS ERECTED THROUGHOUT BUILDING TO CHANGE APT LAYOUTS AND CREATE ADDL'T BDRMS., OBTAIN ALL PERMITS #39143673X | Sep 26, 2025 IN VIOLATION | $1,277 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 24, 2026 | A | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE TRASH AND GARBAGE AT FRONT YARD COURT, 1st STORY | Dec 28, 2026 |
| Sep 24, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AND GARBAGE AT PUBLIC HALL, 1st STORY | Oct 29, 2026 |
| Sep 24, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR LEADING FROM STREET TO PUBLIC HALL AT PUBLIC HALL, 1st STORY | Oct 8, 2026 |
| Sep 24, 2026 | A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR, INCLUDING HANDRAIL AT STAIRCASE THROUGHOUT AT ALL STORIES AT PUBLIC HALL | Dec 28, 2026 |
| Sep 24, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT ALL WALLS AT ALL STORIES AT PUBLIC HALL | Dec 28, 2026 |
| Sep 24, 2026 | B | 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF EVIDENCE OF FLIES OBSERVED AT PUBLIC HALL, 1st STORY | Oct 29, 2026 |
| Sep 24, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT PUBLIC HALL, 1st STORY | Oct 20, 2026 |
| Sep 24, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT EAST WALL AT PUBLIC HALL, 2nd STORY | Oct 29, 2026 |
| Sep 24, 2026 | A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS ASSEMBLIES AT BUILDING ENTRANCE DOOR LEADING FROM STREET AT PUBLIC HALL, 1st STORY | Dec 28, 2026 |
| Sep 24, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 2nd STORY | Oct 29, 2026 |
| Sep 24, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES, FURNITURE, AT PUBLIC HALL, 2nd STORY | Oct 29, 2026 |
| Sep 24, 2026 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Oct 29, 2026 |
| Sep 24, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL, 2nd STORY | Oct 20, 2026 |
| Sep 14, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT FRONT OF BUILDING | Oct 19, 2026 |
| Sep 14, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Oct 19, 2026 |
| Sep 11, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL AT PUBLIC HALL, 2nd STORY | Oct 16, 2026 |
| Jul 29, 2026 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT VESTIBULE AT 1ST STORY | Sep 2, 2026 |
| Jul 29, 2026 | B | § 27-2005 ADM CODE PROVIDE AN UNLOCKABLE SLIDE BOLT OR HOOK AT ROOF DOOR THAT DOES ALLOW RE-ENTRY FROM ROOF TO PUBLIC HALL AT BULKHEAD AT 2ND STORY | Sep 2, 2026 |
| Jul 29, 2026 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Sep 2, 2026 |
| Jul 29, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT PUBLIC HALL, 2nd STORY | Aug 24, 2026 |
| Jul 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR AT 1ST STORY | Aug 12, 2026 |
| Jul 29, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLIES AT BUILDING ENTRANCE DOOR AT 1ST STORY | Sep 2, 2026 |
| Jul 29, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT VESTIBULE AT 1ST STORY | Nov 1, 2026 |
| Jul 29, 2026 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF PANIC BAR INSTALLED AT ROOF DOOR THAT DOESN'T ALLOW RE-ENTRY FROM ROOF TO PUBLIC HALL AT BULKHEAD, 2ND STORY | Aug 4, 2026 |
| Jul 29, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY MOTISE LOCK AND ASSEMBLIES AT VESTIBULE DOOR AT 1ST STORY | Aug 4, 2026 |
| Jul 29, 2026 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS INSTALLED AT BUILDING ENTRANCE DOOR AT 1ST STORY | Sep 2, 2026 |
| Jul 29, 2026 | B | § 27-2005 ADM CODE PROVIDE APPROVED GLASS AT BUILDING ENTRANCE DOOR AT 1ST STORY | Sep 2, 2026 |
| Jul 29, 2026 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRE AT SOUTH WALL AT VESTIBULE AT 1ST STORY | Sep 2, 2026 |
| Jul 29, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT VESTIBULE AT 1ST STORY | Sep 2, 2026 |
| Jun 25, 2026 | C | Apt 1F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 21, 2026 |
| Jun 25, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY | Jul 1, 2026 |
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Mar 19, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Apr 23, 2026 |
| Mar 19, 2026 | C | Apt 1F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 25, 2026 |
| Mar 19, 2026 | A | Apt 1F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 22, 2026 |
| Feb 23, 2026 | C | Apt 2R · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 22, 2026 |
| Feb 23, 2026 | C | Apt 2R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDS THE MAXIMUM OF 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 1, 2026 |
| Feb 23, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Mar 1, 2026 |
| Feb 9, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY | Feb 15, 2026 |
| Dec 26, 2025 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 30, 2026 |
| Dec 26, 2025 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 21, 2026 |
| Dec 26, 2025 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 30, 2026 |
| Dec 26, 2025 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 30, 2026 |
| Dec 26, 2025 | A | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 31, 2026 |
| Aug 19, 2025 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Sep 23, 2025 |
| May 21, 2025 | A | Apt 1R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE FOYER LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 24, 2025 |
| May 21, 2025 | A | Apt 1R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 24, 2025 |
| Mar 21, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING BULKHEAD 2ND STORY | Jun 24, 2025 |
| Jun 27, 2024 | B | Apt 1F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING CERAMIC FLOOR TILES [ WALKING AREA ] IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 1, 2024 |
| Mar 8, 2023 | C | Apt 1R · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Apr 1, 2023 |
| Mar 7, 2023 | A | Apt 1R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SHEETROCK AND STUD PARTITION ERECTED FROM FLOOR TO CEILING OBSTRUCTING NATURAL LIGHT AND VENTILATION IN THE 2nd ROOM FROM EAST LOCATED AT A | Jun 10, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 24, 2026 | HPD A | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE TRASH AND GARBAGE AT FRONT YARD COURT, 1st STORY | Open |
| Sep 24, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AND GARBAGE AT PUBLIC HALL, 1st STORY | Open |
| Sep 24, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR LEADING FROM STREET TO PUBLIC HALL AT PUBLIC HALL, 1st STORY | Open |
| Sep 24, 2026 | HPD A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR, INCLUDING HANDRAIL AT STAIRCASE THROUGHOUT AT ALL STORIES AT PUBLIC HALL | Open |
| Sep 24, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT ALL WALLS AT ALL STORIES AT PUBLIC HALL | Open |
| Sep 24, 2026 | HPD B | 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF EVIDENCE OF FLIES OBSERVED AT PUBLIC HALL, 1st STORY | Open |
| Sep 24, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT PUBLIC HALL, 1st STORY | Open |
| Sep 24, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT EAST WALL AT PUBLIC HALL, 2nd STORY | Open |
| Sep 24, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS ASSEMBLIES AT BUILDING ENTRANCE DOOR LEADING FROM STREET AT PUBLIC HALL, 1st STORY | Open |
| Sep 24, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 2nd STORY | Open |
| Sep 24, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES, FURNITURE, AT PUBLIC HALL, 2nd STORY | Open |
| Sep 24, 2026 | HPD B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Open |
| Sep 24, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL, 2nd STORY | Open |
| Sep 14, 2026 | HPD B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT FRONT OF BUILDING | Open |
| Sep 14, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Open |
| Sep 11, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL AT PUBLIC HALL, 2nd STORY | Open |
| Jul 29, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT VESTIBULE AT 1ST STORY | Open |
| Jul 29, 2026 | HPD B | § 27-2005 ADM CODE PROVIDE AN UNLOCKABLE SLIDE BOLT OR HOOK AT ROOF DOOR THAT DOES ALLOW RE-ENTRY FROM ROOF TO PUBLIC HALL AT BULKHEAD AT 2ND STORY | Open |
| Jul 29, 2026 | HPD B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Open |
| Jul 29, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT PUBLIC HALL, 2nd STORY | Open |
| Jul 29, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR AT 1ST STORY | Open |
| Jul 29, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLIES AT BUILDING ENTRANCE DOOR AT 1ST STORY | Open |
| Jul 29, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT VESTIBULE AT 1ST STORY | Open |
| Jul 29, 2026 | HPD C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF PANIC BAR INSTALLED AT ROOF DOOR THAT DOESN'T ALLOW RE-ENTRY FROM ROOF TO PUBLIC HALL AT BULKHEAD, 2ND STORY | Open |
| Jul 29, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY MOTISE LOCK AND ASSEMBLIES AT VESTIBULE DOOR AT 1ST STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 5:17 PM ET. BBL 2027620085.