3 floors · 4 apartments · 2,800 sq ft · built 1905 · class C3 · owner of record: Ryerson Plaza L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-30 (Accepted). Agency page | Dec 31, 2026 in 68 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 3, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.FAILURE TO PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED A PER BC903.2 AND 27-954 FOR FIRST FLOOR APARTMENT.REM:DISCONTINUE ILLEGL OCCUPANCY. #35443940K | Oct 25, 2021 IN VIOLATION | $312 |
| Sep 3, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.FAIURE TO PROVIDE THE REQUIRED FIRE ALARM SYSTEM FOR SRO'S AT FIRST FLOOR APARTMENT.REM:DISCONTINUE ILLEGAL OCCUPANCY. #35443941M | Oct 25, 2021 IN VIOLATION | $625 |
| Sep 3, 2019 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY CERTIFICATE OF OCCUPANCY #163229DOB RECORDS INDICATE PREMISES TO BE LEGALLY APPROVED AS A TWO(2)FAMILYDWELLING.ILLEGAL OCCUPANCY NOTED AT 1ST FLR APARTMENT CONVERTED TO 2 S #35443943X | Oct 25, 2021 IN VIOLATION | $625 |
| Oct 24, 2018 | Unknown CLASS - 2 FAIL TO PROVIDE EFFECTIVE ELECTRICAL CONTINUITY FOR METAL RACEWAYS ENCLOSURES CABLE ARMOR. LIGHTING RACEWAY AT GROUND FLOOR ENTRANCE AND 3RDFL LIGHTING IN HALLWAY IS NOT CONTINUOUS. REMEDY:PROVIDE EFFECTIVE ELE #35359113P | Dec 28, 2020 IN VIOLATION | $600 |
| Oct 24, 2018 | Unknown CLASS - 2 PROHIBITED USE OF ELECTRICAL METALLIC TUBING(EMT) ELECTRICAL METALLIC TUBING USED OUTDOOR BY GROUND FLOOR ENTRANCE. REMEDY: COMPLY WITH EC CODE #35359114R | Dec 28, 2020 IN VIOLATION | $250 |
| Oct 24, 2018 | Unknown CLASS - 1 UNAPPROVED UNSAFE UNSUITABLE ELECTRICAL EQUIPMENT DEVICES APPARATUS APPLIANCES MATERIALS OR WIRING IN USE. EXPOSED WIRES AT GROUND FLOOR ENTRANCE AND FLEXIBLE CORDS USED FOR POWER IN 2ND FL BATHROOM AND 1ST FL #35359112N | Apr 5, 2021 IN VIOLATION | $400 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09176 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #12096 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #14710 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #11251 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #38972 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 9, 2025 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HANDRAIL FROM BOTTOM UP AT PUBLIC HALL, 1st STORY | Aug 13, 2025 |
| Jul 9, 2025 | B | § 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM. | Aug 13, 2025 |
| Jul 6, 2021 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BALUSTER 2ND AND 17TH FROM BOTTOM UP AT HAND RAIL AT PUBLIC HALL STAIRS, 2nd STORY | Aug 10, 2021 |
| Jul 6, 2021 | A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE WITH GROUTED JOINTS/CAULKING OF VISIBLE MOLD AT EAST AND NORTH WALLS AROUND BATHTUB AT COMMUNITY BATHROOM, 2nd STORY | Oct 9, 2021 |
| Jul 6, 2021 | C | Apt 4 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT B-ROOM 4, 3rd STORY, 2nd B-ROOM FROM EAST AT SOUTH | Aug 1, 2021 |
| Jun 21, 2017 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CONSTRUCTION RUBBISH AT CELLAR | Jul 26, 2017 |
| Mar 10, 2017 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FRONT AT CELLAR | Apr 14, 2017 |
| Sep 7, 2011 | B | § 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM. AT PUBLIC HALL, 3rd STORY | Oct 12, 2011 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 8:42 AM ET. BBL 3018920024.