Queens · Block 9875 · Lot 1 · 11432

83-10 84 Avenue

2 floors · 77,714 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education

24open violations
$13,840ECB/OATH penalties owed
0HPD class C (immediately hazardous)
66dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 66 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-18 (Accepted). Agency page

Dec 31, 2026
in 66 days
4 of 4 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 77,714 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9875). Agency page

Dec 31, 2035
in 3353 days
Next due 2035

Open violations

ECB / OATH (5) · $13,840 owed
IssuedViolationHearingBalance
Jul 1, 2026Construction CLASS - 2
AT THE TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS, I OBSERVED OPEN UNENCLOSED PERIMETER WORK ONGOING. I ALSO OBSERVED THAT THERE WERE NO GUARDRAIL SYSTEMS IN PLACE ON SCAFFOLDING, WINDOW OPENING AND LE
#39556117K
Sep 8, 2026
DEFAULT
$5,030
May 1, 2026Unknown CLASS - 2
MISCELLANEOUS VIOLATIONS.BC 3314.1 SCOPE SCAFFOLD:DURING INSPECTION OFAN SCA PROJECT,I OBSERVED SUPPORTED SCAFFOLD IN PLACE AROUND THE BUILDING.I NOTICED THAT THE NETTING ON THE SCAFFOLD WAS DISLODGED,HANGING,M
#39553712L
Jan 26, 2027
$2,500
Mar 4, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.AT TIME OF INSPECTION,CONTRACTOR HAS FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION
#39551228K
Mar 25, 2027
DEFAULT
$1,280
Feb 16, 2026Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED JOB SITE CLOSED. THE SIDEWALK SHED INSTALLED ON WALKWAY AT EXPOSURE 1, 2, MISSING PROJECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL/CONSTRUCTION SIGN NOT PROVIDED OR NOT IN CO
#39550392H
Apr 28, 2026
ADMIT/IN-VIO
$0
Jan 7, 2026Unknown CLASS - 1
BC 3314.1 SCOPE SCAFFOLD: DURING INSPECTION OF AN SCA PROJECT, I OBSERVED SUPPORTED SCAFFOLD IN PLACE AROUND THE BUILDING. I NOTICED THAT THE NETTING ON THE SCAFFOLD WAS DISLODGED, HANGING, MISSING AND BLOWING
#39548865X
Dec 4, 2026
DEFAULT
$5,030
DOB (5)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#18180
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#18179
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#16784
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#16785
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#04063
DOB VIOLATION - ACTIVE
DOB NOW Safety (17)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 1, 2026ECBConstruction: AT THE TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS, I OBSERVED OPEN UNENCLOSED PERIMETER WORK ONGOING. I ALSO OBSERVED THAT THERE WERE NO GUARDRAIL SYSTEMS IN PLACE ON SCAFFOLDING, WINDOW OPENING AND LEClosed
Jul 1, 2026ECBConstruction: AT TIME OF INSPECTION, I OBSERVED AT PREMISES CONSTRUCTION WORK IN PROGRESS DURING THE AFTER-HOURS WORK VARIANCE PERIOD. UPON REQUEST FOR AN AFTER-HOURS WORK VARIANCE PERMIT, NONE WAS PROVIDED. UPON REVIEW OF DClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 7:14 AM ET. BBL 4098750001.

Look up another building