4 floors · 14 apartments · 8,022 sq ft · built 1931 · class C1 · owner of record: Arn 828 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 427 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 23, 2022 | Construction CLASS - 1 28-104.7.7 MISC VIOLATIONS.NOTE:AT TIME OF INSPECTION OBSERVED ENTIRE BUILDING LIGHT GAUGE C JOIST IN CEILINGS INSTALLED W/O TR 1 FILED AT DOB RECORDS.STOP ALL WORK ENTIRE BUILDING.REMEDY:CONTACT DOB FOR FURTHE #35358505J | Dec 16, 2022 IN VIOLATION | $625 |
| Oct 14, 2021 | Site Safety CLASS - 1 CONSTRUCTIN SUPERINTENDENT FAILURE TO PERFORM DUTIES PER CODE.AT TIME OF INSPECTION OF ACTIVE JOB SITE WITH STEEL FRAMING AT 3RD FLOOR LEVEL OBSERVED CONSTRUCTION SUPERINTENDENT AND C.S. LOGS WERE NOT ON SITE. #35575653M | Aug 12, 2022 IN VIOLATION | $10,000 |
| Jul 14, 2021 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER CODE.AT TIME OF INSPECTION ON AN ACTIVE 4 STORY ALT CONSTRUCTION SITE,NOTICED 5 WORKERS ONSITE IN PROCESS OF ERECTING A SIDEWALK SHED AND PIPE SCAFFOL #35547466Z | Apr 15, 2022 IN VIOLATION | $2,500 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 28, 2026 | A | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 1, 2027 |
| Sep 28, 2026 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH. WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 2, 2026 |
| Sep 28, 2026 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 24, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 28, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH. WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 28, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 10:41 PM ET. BBL 2045140028.