16 floors · 105 apartments · 166,833 sq ft · built 1928 · class RM · owner of record: Unavailable Owner
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 166,833 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1889). Agency page | Dec 31, 2029 in 1143 days | Next due 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-19 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $438,320 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2025-03-26) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 22, 2025 | Unknown CLASS - 2 I OBSERVED IN APARTMENT 2D THROUGHOUT THE APARTMENT USE OF MULTIPLE EXTENSION CORDS PLEASE SEE NEC ARTICLE 400.8, COMPLY WITH EC #39136118L | Apr 3, 2025 DEFAULT | $4,000 |
| Jan 22, 2025 | Unknown CLASS - 2 I OBSERVED IN APARTMENT 2D IN THE KITCHEN REMOVAL OF LIGHT FIXTURE, NO APPLICATION ON FILE WITH D.O.B., OBTAIN PERMIT., OBTAIN PERMIT #39136119N | Apr 3, 2025 DEFAULT | $4,000 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRE BY 28-302.5 FOR CONTROL #906593.REMEDY:FILE ACCEPTABLE REPORT #37026277Z | Aug 15, 2024 IN VIOLATION | $0 |
| Mar 4, 2010 | Plumbing CLASS - 2 FAIL MAINTAIN BLDG IN COMPLIANT MANNER: INSTALLATION MAINTENANCE OF PLUMBING MATERIALS/EQUIPMENT PER FGC 406.6.2 GAS METERS INSTALLED IN AN IMPROPER LOCATION. IN THE 16 STORIES RESIDENTIAL BLDG GAS METERS & REL #34806687J | Feb 2, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00441 | DOB VIOLATION - ACTIVE |
| Feb 21, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #909966 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Feb 21, 2022 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 21, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 28, 2026 | A | Apt 4C · § 27-2005 HMC: REFIT UPPER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 1, 2027 |
| Sep 28, 2026 | A | Apt 4C · § 27-2005 HMC: REFIT UPPER SASH AT WINDOW IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 1, 2027 |
| Sep 28, 2026 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT CENTER LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 2, 2026 |
| Sep 28, 2026 | A | Apt 4C · § 27-2005 HMC: REFIT UPPER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT CENTER LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 1, 2027 |
| Sep 28, 2026 | A | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT CENTER LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 1, 2027 |
| Sep 28, 2026 | A | Apt 4C · § 27-2005 HMC: REFIT UPPER AND LOWER SASH AT NORTH WINDOW IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 1, 2027 |
| Sep 28, 2026 | A | Apt 4C · § 27-2005 HMC: REFIT UPPER AND LOWER SASH AT 2ND WINDOW FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 1, 2027 |
| Apr 20, 2026 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERATIVE BELL, BUZZER,INTERCOM SYSTEM FROM 1ST FLOOR PUBLIC HALL VESTIBULE TO THE PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 25, 2026 |
| Apr 20, 2026 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE POWER OUTLET AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 25, 2026 |
| Apr 20, 2026 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 25, 2026 |
| Oct 6, 2025 | A | Apt 2D · § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION .. IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 9, 2026 |
| Sep 2, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 7, 2025 |
| Sep 2, 2025 | A | Apt 2D · § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION . IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 6, 2025 |
| Sep 2, 2025 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER RETURN AT WEST WALL IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 7, 2025 |
| Sep 2, 2025 | B | Apt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 7, 2025 |
| May 20, 2025 | A | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 23, 2025 |
| May 20, 2025 | B | Apt 2D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ. FT. AT WEST AND NORTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2025 |
| May 20, 2025 | B | Apt 2D · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2025 |
| May 20, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2025 |
| May 20, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2025 |
| May 20, 2025 | A | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 23, 2025 |
| May 20, 2025 | A | Apt 2D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 23, 2025 |
| May 20, 2025 | C | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL AT CLOSET (EAST) IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 26, 2025 |
| May 20, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC WALL TILES AT WEST IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2025 |
| Feb 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 10, 2025 |
| Feb 3, 2025 | A | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 9, 2025 |
| Feb 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 10, 2025 |
| Feb 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 10, 2025 |
| Feb 3, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE CLOSET AT EAST IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 10, 2025 |
| Feb 3, 2025 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 10, 2025 |
| Nov 26, 2024 | B | Apt 4C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT WEST AND NORTH WALLS IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17147216 ISSUED 27-JUL-24 HAS BEEN UPGRADED T | Dec 31, 2024 |
| Nov 26, 2024 | B | Apt 4C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT WEST WALL IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17147218 ISSUED 27-JUL-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE § | Dec 31, 2024 |
| Jul 29, 2024 | B | § 27-2053 ADM CODE PROVIDE DWELLING WITH A JANITOR OR RESPONSIBLE PERSON OR JANITORIAL SERVICE. | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET UNDER SINK IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND WEST WALLS IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER WINDOW SASH AT WEST WALL IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH AT 1ST WINDOW FROM EAST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERBALANCE UPPER SASH 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 29, 2024 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERBALANCE AT UPPER SASH AT WINDOW AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 2, 2024 |
| Jul 16, 2024 | C | Apt 2D · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATERCLOSET IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 22, 2024 |
| Jul 11, 2024 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 15, 2024 |
| Jul 8, 2024 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING FRONT ENTRANCE AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 12, 2024 |
| May 9, 2024 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER PALANCE AT LOWER WINDOW SASH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 13, 2024 |
| May 9, 2024 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER PALANCE AT LOWER WINDOW SASH AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 13, 2024 |
| May 9, 2024 | B | Apt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 13, 2024 |
| May 9, 2024 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST AND EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 13, 2024 |
| May 6, 2024 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 10, 2024 |
| May 6, 2024 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd BATHROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 10, 2024 |
| May 6, 2024 | B | Apt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 10, 2024 |
| May 6, 2024 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 10, 2024 |
| May 6, 2024 | B | Apt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL AT ELECTRICAL FUSE BOX IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 10, 2024 |
| May 6, 2024 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 10, 2024 |
| May 8, 2023 | B | Apt 11C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL UNDERNEATH SINK IN THE KITCHEN LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 12, 2023 |
| May 8, 2023 | A | Apt 11C · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL SWITCH COVER PLATE AT NORTH WALL IN THE FOYER LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 11, 2023 |
| Mar 29, 2023 | B | Apt 11C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 3, 2023 |
Showing 60 of 125. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 28, 2026 | HPD A | § 27-2005 HMC: REFIT UPPER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 28, 2026 | HPD A | § 27-2005 HMC: REFIT UPPER SASH AT WINDOW IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 28, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT CENTER LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 28, 2026 | HPD A | § 27-2005 HMC: REFIT UPPER SASH AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT CENTER LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 28, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT CENTER LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 28, 2026 | HPD A | § 27-2005 HMC: REFIT UPPER AND LOWER SASH AT NORTH WINDOW IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 28, 2026 | HPD A | § 27-2005 HMC: REFIT UPPER AND LOWER SASH AT 2ND WINDOW FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 11:28 PM ET. BBL 1018897501.