Manhattan · Block 2139 · Lot 578 · 10033

824 West 176 Street

6 floors · 42 apartments · 54,562 sq ft · built 1924 · class D1 · owner of record: P & R Equities, Inc

27open violations
$0ECB/OATH penalties owed
5HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 54,562 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2139). Agency page

Dec 31, 2029
in 1143 days
Next due 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-23 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2101166
DOB VIOLATION - ACTIVE
Jun 30, 2008ELEVATOR

#9444/261083
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (22) · C 5 · B 14 · A 3
IssuedClassViolationCorrect by
Jun 15, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMASep 18, 2026
Jun 9, 2025CApt 3F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 23, 2025
Nov 19, 2024BApt 2C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTDec 24, 2024
Nov 19, 2024BApt 2C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTDec 24, 2024
Nov 19, 2024CApt 2C · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTNov 19, 2024
Nov 19, 2024C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT BASEMENTNov 25, 2024
Oct 15, 2024BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 19, 2024
Oct 15, 2024AApt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH, EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 18, 2025
Oct 15, 2024BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AT ALL CERAMIC TILE WALLS IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 19, 2024
Nov 6, 2023C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL NORTH WALL AT PUBLIC HALL, 5th STORYNov 12, 2023
Mar 17, 2022BApt 6G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL APROX. 1 SQ.FT IN THE 1st ROOM FROM EAST LOCATED AT APT 6G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 14674239 ISSUED 16-NOV-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODEApr 21, 2022
Feb 22, 2022BApt 4E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMar 29, 2022
Feb 22, 2022BApt 4E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN CLOSET IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMar 29, 2022
Feb 22, 2022BApt 4E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE FOYER LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMar 29, 2022
Feb 22, 2022BApt 4E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMar 29, 2022
Dec 7, 2021B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 6th STORYJan 11, 2022
Dec 7, 2021A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 6th STORYMar 12, 2022
Nov 17, 2021BApt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 22, 2021
Nov 17, 2021BApt 6G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 22, 2021
Nov 17, 2021CApt 6G · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE . IN THE ENTRANCE LOCATED AT APT 6G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 13, 2021
Nov 17, 2021BApt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 22, 2021
Aug 16, 2018BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 20, 2018

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 8:27 PM ET. BBL 1021390578.

Look up another building