3 floors · 144 apartments · 114,750 sq ft · built 1986 · class C9 · owner of record: Union Housing Preservation Lp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2696). Agency page | Dec 31, 2026 in 67 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (12 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-07 (Accepted). Agency page | Dec 31, 2026 in 67 days | 4 of 12 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 114,750 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 30, 2023 | Boilers CLASS - 2 FOUND A SIX HYROTHERM MODULE BOILER NOT OPERATIONAL . U RATED TANK NEED RELEIF VALVE/MISSING BOILER NAME PLATE/ HOT WATER PIPE LEAKING/CORRECT ALL VIOLATING CONDITIONS/ SUBMIT CERTIFICATE OF CORRECTIONS #39087300J | Jun 30, 2023 POP/IN-VIO | $0 |
| May 30, 2023 | Boilers CLASS - 2 FOUND A MODULE OF 3 HYDROTHERM BOILERS WERE 0NE OF THE THREE WASN'T OPERATIONAL #39087304R | Jun 30, 2023 POP/IN-VIO | $0 |
| Aug 9, 2021 | Boilers CLASS - 2 NO RATING PLATE AND BOILER AND NEED TO FIX JACKET FOR BOILER NEED TO CLEAN CHIMNEY BASE. #39045694X | Aug 12, 2021 POP/IN-VIO | $0 |
| Aug 9, 2021 | Boilers CLASS - 2 NEED RATING PLATE FOR BOILER AND NEED TO FIX JACKET ON BOILER. NEED TO CLEAN CHIMNEY BASE #39045696J | Aug 12, 2021 POP/IN-VIO | $0 |
| Aug 9, 2021 | Boilers CLASS - 2 NEED RATING PLATE FOR BOILER AND NEED TO FIX JACKET FOR BOILER AND NEED TO CLEAN OUT CHIMNEY BASE #39045697L | Aug 12, 2021 POP/IN-VIO | $0 |
| Jul 23, 2021 | Boilers CLASS - 2 BOILERS NOT REGISTERED UNDER JOB #220479845 SLINT FIN 2014, BTU 300000 NOT S/O BACKFLOW LEAKING , INLET FOR BOILER LEAKING IN FRONT OF BOILER #39044860H | Aug 12, 2021 POP/IN-VIO | $0 |
| Oct 10, 2018 | Boilers CLASS - 2 36:AS PER CLASS 254-36 BOILER NOT REGISTER AS PER DOB RECORDS CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTIONS #32097854X | Dec 21, 2018 POP/IN-VIO | $0 |
| Oct 10, 2018 | Boilers CLASS - 2 36:AS PER CLASS 254-36 BOILER NOT REGISTER AS PER DOB RECORDS.CORRECT ALL VIOLATIONS CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTIONS. #32097853Y | Dec 21, 2018 POP/IN-VIO | $0 |
| Apr 11, 2018 | Boilers CLASS - 2 B254,36,50. 36-AS PER CLASS 254-36 BOILER NOT REGISTER AS PER DOB RECORDS; 50-RATING PLATE MISSING ON BOILER. #32096556N | Jul 6, 2018 POP/IN-VIO | $0 |
| Jan 14, 2015 | Construction CLASS - 1 B101/51/ NO PERMIT FOR 3000 GAL OIL TANK LOCATED OUTSIDE OF BUILDING. #32074553K | Mar 20, 2015 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07651 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07652 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2026 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASEBOARD RADIATOR COVER AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Nov 23, 2026 |
| Oct 19, 2026 | C | Apt 2B · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES THRU-OUT ALL ROOMS IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Oct 25, 2026 |
| Jun 22, 2026 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY | Sep 25, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Open |
| Oct 19, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASEBOARD RADIATOR COVER AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Open |
| Oct 19, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Open |
| Oct 19, 2026 | HPD C | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES THRU-OUT ALL ROOMS IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''863'' | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 3:19 PM ET. BBL 2026960005.