| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 33,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 22, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#347814 VIO#073025PI20104SB DATED 07/30/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 8/30/25 & START BLDG REPAIRS UNDER PERMIT BY 9/30/25&COMPL/SIGNED OFF BY 10/30/25 AS OF 10/22/25 A CAP & EVIDENCE OF COMPL WRK WAS NOT REC'D IMMED COMPLY W/COMMISSIONER #PI20612ZT | DOB VIOLATION - ACTIVE |
| Jul 30, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD MISSING MORTAR & CRACKED MASONRY @ SEVERAL LOCATIONS ON CMU WALL @ EXP4. CMU WALL IS ADJ AN OCCUPIED PARKING LOT. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG&SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 8/7/25 ADRESSING ALL #PI20104SB | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 1:30 PM ET. BBL 2025920021.