Bronx · Block 2866 · Lot 70 · 10453

82 Macombs Road

5 floors · 122,130 sq ft · built 1924 · class W1 · owner of record: Nyc Department Of Education

34open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
71dto Energy audit and retro-commissioning (2026)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 71 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2866). Agency page

Dec 31, 2026
in 71 days
Due this year
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 122,130 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 192 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 192 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1167 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-02 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (19)
IssuedViolationHearingBalance
Jul 28, 2026Construction CLASS - 2
REISSUE ON ECB #35693533P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINGING, MISSING AND/OR FAULTY HARDWARE ON CLASSROOMS 305,
#35734839X
Aug 21, 2026
POP/IN-VIO
$0
Jul 28, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: MISSING FIRE STOPPING IN ELECTRIC SWITCH GEAR ROOM AND GAS METER ROOM THROUGH CMU, BLOCK WALL AT BASEMENT LEV
#35734840N
Aug 21, 2026
POP/IN-VIO
$0
Jul 28, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: EXTERIORPUBLIC LIGHT FIXTURES NOT WORKING AT SUN DOWN ON FACADE AT EXPOSURES 2, 3 AND 4 OBSERVED UPON INSPECTION. REMEDY: REPAIR AND/OR REPLACE.
#35734843Z
Aug 21, 2026
POP/IN-VIO
$0
Jul 28, 2026Construction CLASS - 2
REISSUE ON ECB #35693531L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 5TH FL GYM, A PUBLIC ASSEMBLY SIGN WAS NOT POSTED OR AVAILABLE AND 2ND FL MEZZANINE LEVEL TO PROVIDE THE CAPACITY ON E
#35734841P
Aug 21, 2026
POP/IN-VIO
$0
Jul 28, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: INSTALLATION OF ILLEGAL HARDWARE KICK STOPS ON FIRE RATED DOORS AT CAFETERIA MAIN
#35734842R
Aug 21, 2026
POP/IN-VIO
$0
Jul 28, 2026Construction CLASS - 2
REISSUE ON ECB #35693534R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: A BROKEN HEAD AT MAIN ENTRANCE AND 2
#35734838Y
Aug 21, 2026
POP/IN-VIO
$0
Aug 25, 2025Construction CLASS - 2
RE-ISSUE #35688870J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT 5TH FLR-CORRIDOR BY RM #554 AT 4TH FLR-CORRIDOR BY RM #454, AT 3RD FLR-CORRIDOR BY RM #354 SMOKE DOORS ARE NOT CLOS
#35693533P
Oct 17, 2025
POP/IN-VIO
$0
Aug 25, 2025Construction CLASS - 2
RE-ISSUE #35688871L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: OBSERVED AT CELLARLEVEL ELECTRICAL METER ROOM AND GAS METER ROOM HAS SEVERAL HOLES AND/O
#35693532N
Oct 17, 2025
POP/IN-VIO
$0
Aug 25, 2025Construction CLASS - 2
RE-ISSUE #35685000M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS, PER BC 1006.1; 27-381. NOTED: OBSERVED AT 2M LEVEL, GYM HAS EMERGENCY LI
#35693534R
Oct 17, 2025
POP/IN-VIO
$0
Aug 25, 2025Construction CLASS - 2
RE-ISSUE #35688872N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT 5TH FLR-GYM AND 2ND MEZZ, FLR-GYM PUBLIC ASSEMBLY SIGNAGE/CERTIFICATE IS NOT POSTED TO PROVIDE THE CAPACITY OF PEOP
#35693531L
Oct 17, 2025
POP/IN-VIO
$0
Aug 13, 2025Boilers CLASS - 2
FOUND CLEAVER BROOK DUAL FUEL BOILER MODEL3 CBW-200-250, NOT OPERABLE DUE TO PENDING REPAIRS FOR PAST COUPLE YEARS.
#39156987L
Aug 29, 2025
POP/IN-VIO
$0
Sep 26, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:OBSERVED AT 2M LEVEL,GYM HAS EMERGENCY LIGHTS THAT ARE NOT OPERTATIONA
#35685000M
Dec 6, 2024
POP/IN-VIO
$0
Sep 26, 2024Construction CLASS - 2
REISSUE#35676121Y-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT 5TH FLR-CORRIDOR BY RM#554,AT 4FLR-COORIDOR BY RM#454,AT 3 FLR-CORRIDOR BY RM#354 SMOKE DOORS ARE NOT CLOSING PROPERLY D
#35688870J
Dec 6, 2024
POP/IN-VIO
$0
Sep 26, 2024Construction CLASS - 2
REISSUE#35676119P-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBERVED AT 5 FLR-GYM & 2 MEZZ FLR-GYM,PUBLIC ASSEMBLY SIGNAGE/CERTIFICATE IS NOT POSTED TO PROVIDE THE CAPACITY OF PEOPLE ALLOWED TO
#35688872N
Dec 6, 2024
POP/IN-VIO
$0
Sep 26, 2024Construction CLASS - 2
REISSUE#35676120M-FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED OBSERVED AT CELLAR LEVEL ELECTRICAL METER ROOM & GAS METER ROOM HAS SEVERAL HOLES AND/OR PIPES P
#35688871L
Dec 6, 2024
POP/IN-VIO
$0
Jun 7, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED AT 5TH AND 3RD FL GYMNASIUM, PLACE OF ASSEMBLY SIGNAGE/CERTIFICATE IS NOT PROVIDED DISPLAYING THE NUMBER OF PERSONS ABLE TO OCCUPY THE SPACE
#35676119P
Sep 1, 2023
POP/IN-VIO
$0
Jun 7, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTE: OBSERVED AT CELLAR LEVEL, GAS METER ROOM HAS SEVERAL PIPES PENETRATING THROUGH THE WALL WITH OPENINGS THAT ARE
#35676120M
Sep 1, 2023
POP/IN-VIO
$0
Jan 30, 2023Construction CLASS - 1
FAILURE TO INSTITUTE SAFETY MEASURES. PJP INSTALLERS WERE IN THE PROCESS OF DISMANTLING SUPPORTED SCAFFOLD AT EXPOSURE# 4 WHEN WORKER WAS WALKING ON THE PLANKING AND THE PLANK SNAPPED AND WORKER FELL APPROXIMAT
#39078716Z
Mar 11, 2024
IN VIOLATION
$0
Aug 28, 2020Boilers CLASS - 2
OIL LEAK BOTH BOILERS-STRAINER REMOVED BOILER ONE-PRESS SWITCH COVER MISSING-BLOW DOWN VALVE LEAKING-CORROSION ON PIPING-OIL STRAINER REMOVED-AQUASTAT COVER MISSING- STORAGE/COMBUSTIBLES-NO 2ND EGRESS
#39027696K
Aug 31, 2020
POP/IN-VIO
$0
DOB (4)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#06190
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#06189
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#30237
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#30238
DOB VIOLATION - ACTIVE
DOB NOW Safety (11)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 28, 2026ECBConstruction: REISSUE ON ECB #35693533P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINGING, MISSING AND/OR FAULTY HARDWARE ON CLASSROOMS 305,Open
Jul 28, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: MISSING FIRE STOPPING IN ELECTRIC SWITCH GEAR ROOM AND GAS METER ROOM THROUGH CMU, BLOCK WALL AT BASEMENT LEVOpen
Jul 28, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: EXTERIORPUBLIC LIGHT FIXTURES NOT WORKING AT SUN DOWN ON FACADE AT EXPOSURES 2, 3 AND 4 OBSERVED UPON INSPECTION. REMEDY: REPAIR AND/OR REPLACE.Open
Jul 28, 2026ECBConstruction: REISSUE ON ECB #35693531L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 5TH FL GYM, A PUBLIC ASSEMBLY SIGN WAS NOT POSTED OR AVAILABLE AND 2ND FL MEZZANINE LEVEL TO PROVIDE THE CAPACITY ON EOpen
Jul 28, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: INSTALLATION OF ILLEGAL HARDWARE KICK STOPS ON FIRE RATED DOORS AT CAFETERIA MAINOpen
Jul 28, 2026ECBConstruction: REISSUE ON ECB #35693534R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: A BROKEN HEAD AT MAIN ENTRANCE AND 2Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 21, 2026, 8:18 PM ET. BBL 2028660070.

Look up another building