5 floors · 122,130 sq ft · built 1924 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 71 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2866). Agency page | Dec 31, 2026 in 71 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 122,130 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 192 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 192 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1167 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 2 REISSUE ON ECB #35693533P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINGING, MISSING AND/OR FAULTY HARDWARE ON CLASSROOMS 305, #35734839X | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: MISSING FIRE STOPPING IN ELECTRIC SWITCH GEAR ROOM AND GAS METER ROOM THROUGH CMU, BLOCK WALL AT BASEMENT LEV #35734840N | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: EXTERIORPUBLIC LIGHT FIXTURES NOT WORKING AT SUN DOWN ON FACADE AT EXPOSURES 2, 3 AND 4 OBSERVED UPON INSPECTION. REMEDY: REPAIR AND/OR REPLACE. #35734843Z | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 28, 2026 | Construction CLASS - 2 REISSUE ON ECB #35693531L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 5TH FL GYM, A PUBLIC ASSEMBLY SIGN WAS NOT POSTED OR AVAILABLE AND 2ND FL MEZZANINE LEVEL TO PROVIDE THE CAPACITY ON E #35734841P | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: INSTALLATION OF ILLEGAL HARDWARE KICK STOPS ON FIRE RATED DOORS AT CAFETERIA MAIN #35734842R | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 28, 2026 | Construction CLASS - 2 REISSUE ON ECB #35693534R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: A BROKEN HEAD AT MAIN ENTRANCE AND 2 #35734838Y | Aug 21, 2026 POP/IN-VIO | $0 |
| Aug 25, 2025 | Construction CLASS - 2 RE-ISSUE #35688870J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT 5TH FLR-CORRIDOR BY RM #554 AT 4TH FLR-CORRIDOR BY RM #454, AT 3RD FLR-CORRIDOR BY RM #354 SMOKE DOORS ARE NOT CLOS #35693533P | Oct 17, 2025 POP/IN-VIO | $0 |
| Aug 25, 2025 | Construction CLASS - 2 RE-ISSUE #35688871L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: OBSERVED AT CELLARLEVEL ELECTRICAL METER ROOM AND GAS METER ROOM HAS SEVERAL HOLES AND/O #35693532N | Oct 17, 2025 POP/IN-VIO | $0 |
| Aug 25, 2025 | Construction CLASS - 2 RE-ISSUE #35685000M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS, PER BC 1006.1; 27-381. NOTED: OBSERVED AT 2M LEVEL, GYM HAS EMERGENCY LI #35693534R | Oct 17, 2025 POP/IN-VIO | $0 |
| Aug 25, 2025 | Construction CLASS - 2 RE-ISSUE #35688872N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT 5TH FLR-GYM AND 2ND MEZZ, FLR-GYM PUBLIC ASSEMBLY SIGNAGE/CERTIFICATE IS NOT POSTED TO PROVIDE THE CAPACITY OF PEOP #35693531L | Oct 17, 2025 POP/IN-VIO | $0 |
| Aug 13, 2025 | Boilers CLASS - 2 FOUND CLEAVER BROOK DUAL FUEL BOILER MODEL3 CBW-200-250, NOT OPERABLE DUE TO PENDING REPAIRS FOR PAST COUPLE YEARS. #39156987L | Aug 29, 2025 POP/IN-VIO | $0 |
| Sep 26, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:OBSERVED AT 2M LEVEL,GYM HAS EMERGENCY LIGHTS THAT ARE NOT OPERTATIONA #35685000M | Dec 6, 2024 POP/IN-VIO | $0 |
| Sep 26, 2024 | Construction CLASS - 2 REISSUE#35676121Y-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT 5TH FLR-CORRIDOR BY RM#554,AT 4FLR-COORIDOR BY RM#454,AT 3 FLR-CORRIDOR BY RM#354 SMOKE DOORS ARE NOT CLOSING PROPERLY D #35688870J | Dec 6, 2024 POP/IN-VIO | $0 |
| Sep 26, 2024 | Construction CLASS - 2 REISSUE#35676119P-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBERVED AT 5 FLR-GYM & 2 MEZZ FLR-GYM,PUBLIC ASSEMBLY SIGNAGE/CERTIFICATE IS NOT POSTED TO PROVIDE THE CAPACITY OF PEOPLE ALLOWED TO #35688872N | Dec 6, 2024 POP/IN-VIO | $0 |
| Sep 26, 2024 | Construction CLASS - 2 REISSUE#35676120M-FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED OBSERVED AT CELLAR LEVEL ELECTRICAL METER ROOM & GAS METER ROOM HAS SEVERAL HOLES AND/OR PIPES P #35688871L | Dec 6, 2024 POP/IN-VIO | $0 |
| Jun 7, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED AT 5TH AND 3RD FL GYMNASIUM, PLACE OF ASSEMBLY SIGNAGE/CERTIFICATE IS NOT PROVIDED DISPLAYING THE NUMBER OF PERSONS ABLE TO OCCUPY THE SPACE #35676119P | Sep 1, 2023 POP/IN-VIO | $0 |
| Jun 7, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTE: OBSERVED AT CELLAR LEVEL, GAS METER ROOM HAS SEVERAL PIPES PENETRATING THROUGH THE WALL WITH OPENINGS THAT ARE #35676120M | Sep 1, 2023 POP/IN-VIO | $0 |
| Jan 30, 2023 | Construction CLASS - 1 FAILURE TO INSTITUTE SAFETY MEASURES. PJP INSTALLERS WERE IN THE PROCESS OF DISMANTLING SUPPORTED SCAFFOLD AT EXPOSURE# 4 WHEN WORKER WAS WALKING ON THE PLANKING AND THE PLANK SNAPPED AND WORKER FELL APPROXIMAT #39078716Z | Mar 11, 2024 IN VIOLATION | $0 |
| Aug 28, 2020 | Boilers CLASS - 2 OIL LEAK BOTH BOILERS-STRAINER REMOVED BOILER ONE-PRESS SWITCH COVER MISSING-BLOW DOWN VALVE LEAKING-CORROSION ON PIPING-OIL STRAINER REMOVED-AQUASTAT COVER MISSING- STORAGE/COMBUSTIBLES-NO 2ND EGRESS #39027696K | Aug 31, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06190 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06189 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30237 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30238 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 28, 2026 | ECB | Construction: REISSUE ON ECB #35693533P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINGING, MISSING AND/OR FAULTY HARDWARE ON CLASSROOMS 305, | Open |
| Jul 28, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: MISSING FIRE STOPPING IN ELECTRIC SWITCH GEAR ROOM AND GAS METER ROOM THROUGH CMU, BLOCK WALL AT BASEMENT LEV | Open |
| Jul 28, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: EXTERIORPUBLIC LIGHT FIXTURES NOT WORKING AT SUN DOWN ON FACADE AT EXPOSURES 2, 3 AND 4 OBSERVED UPON INSPECTION. REMEDY: REPAIR AND/OR REPLACE. | Open |
| Jul 28, 2026 | ECB | Construction: REISSUE ON ECB #35693531L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 5TH FL GYM, A PUBLIC ASSEMBLY SIGN WAS NOT POSTED OR AVAILABLE AND 2ND FL MEZZANINE LEVEL TO PROVIDE THE CAPACITY ON E | Open |
| Jul 28, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: INSTALLATION OF ILLEGAL HARDWARE KICK STOPS ON FIRE RATED DOORS AT CAFETERIA MAIN | Open |
| Jul 28, 2026 | ECB | Construction: REISSUE ON ECB #35693534R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: A BROKEN HEAD AT MAIN ENTRANCE AND 2 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 21, 2026, 8:18 PM ET. BBL 2028660070.