Staten Island · Block 2450 · Lot 7512 · 10314

82 Belmar Drive West

2 floors · 92 apartments · 111,394 sq ft · class R3 · owner of record: Oaks At Latourette Condo

131open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 111,394 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2450). Agency page

Dec 31, 2030
in 1507 days
Next due 2030

Open violations

ECB / OATH (0)

None open.

DOB (16)
IssuedViolationStatus
Feb 2, 2018FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00395
DOB VIOLATION - ACTIVE
Nov 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00466
DOB VIOLATION - ACTIVE
Aug 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00605
DOB VIOLATION - ACTIVE
May 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01135
DOB VIOLATION - ACTIVE
Feb 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00444
DOB VIOLATION - ACTIVE
Nov 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00522
DOB VIOLATION - ACTIVE
Aug 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00706
DOB VIOLATION - ACTIVE
Jun 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01069
DOB VIOLATION - ACTIVE
Feb 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00605
DOB VIOLATION - ACTIVE
Nov 2, 2015FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00724
DOB VIOLATION - ACTIVE
Aug 2, 2015FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01046
DOB VIOLATION - ACTIVE
May 2, 2015FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01538
DOB VIOLATION - ACTIVE
May 1, 2014FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00708
DOB VIOLATION - ACTIVE
May 3, 2012FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#03373
DOB VIOLATION - ACTIVE
Jan 1, 2012FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#03036
DOB VIOLATION - ACTIVE
Dec 10, 2010CONSTRUCTION

#CN0201RR
DOB VIOLATION - ACTIVE
DOB NOW Safety (115)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active

Showing 60 of 115. Full list on the agency site.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 12:07 PM ET. BBL 5024507512.

Look up another building