Queens · Block 6858 · Lot 1 · 11432

82-68 164 Street

12 floors · 1,069,367 sq ft · built 1939 · class I1 · owner of record: Nyc Health And Hospitals Corporation

68open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
66dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 66 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 1,069,367 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 483 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6858). Agency page

Dec 31, 2028
in 797 days
Next due 2028
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-10 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (7)
IssuedViolationHearingBalance
Oct 15, 2022Construction CLASS - 2
EXP1 OBSERVED SUSPEND.SF LEFT SUSPENDED,NOT SECURED,STIPULATED PER CODE-AT END OF SHIFT-SHALL BE LOWERED TO THE STREET/SWS DECK OR SHALL BE SECURED TO ROOF/BUILDING IN ACCORDANCE DESIGN DRAWINGS REQUIRED BY SEC
#39507671R
Nov 29, 2022
ADMIT/IN-VIO
$0
Oct 15, 2022Construction CLASS - 2
EXP 1 OBSERVED LOOSE NETS NOT COVERING OPENING ABOVE FENCE FOR SITE IN FACADE OPEARATIONS,HAZARDS OF DEBRIS/MATERIALS GOING THROUGH OPENING UNTO DRIVEWAY/PUBLIC SIDEWALK STRIKING VEHICLES/PEDESTRIANS.CODE STIPU
#39507673K
Nov 29, 2022
ADMIT/IN-VIO
$0
Oct 15, 2022Construction CLASS - 2
EXP 1 ACTIVE DRIVEWAY FOR EMS FIRST RESPONDERS W/SWS,PIPE SF,CHAIN LINK FENCE AND VERT NETTING OBSTRUCTING VIEW FOR DRIVERS WHEN VEHICLES EXIT FACILITY.OBSERVED NO BLIND MIRRORS IN PLACE AND NO WARNING SIGNS FO
#39507674M
Nov 29, 2022
ADMIT/IN-VIO
$0
Oct 15, 2022Construction CLASS - 2
EXP1 OBSERVED 3 FOOT BY 8 FOOT OPENING IN CHAIN LINK FENCE HAZARD OF PUBLIC GAINING ACCESS TO WORK ZONE AREA FACADE OPERATIONS W/SUSPENDED SF NOT LOWER TO SWS DECK/GROUND, UNSECURED TO BUILDING(3314.10.1)HAZARD
#39507672Z
Nov 29, 2022
ADMIT/IN-VIO
$0
Feb 5, 2018Construction CLASS - 2
FAILURE TO FILE A FINAL INSPECTION FOR COMPLETED WORK WITHIN 1 YEAR OFPERMIT EXPIRATION. PREMISES UNDER ALT2 #420503994 WHICH PERMITS EXPIR ED ON 12-31-13 APPLICATION FILED FOR RENOVATIONS OF PORTIONS OF 3RD LE
#35307443N
Mar 27, 2018
POP/IN-VIO
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT. REMEDY: FILE ARCHITECT/ENGINEER REPORT.
#36012547X
Aug 3, 2010
WRITTEN OFF
$0
Aug 5, 1998Construction Non-Hazardous
DEMOLITION WORK WITHOUT A PERMIT. NOTED 2 BUILDINGS 4 STORIES HIGH. KNOWN AS BUILDING C AND BUILDING D. DEMOLISHED TO GRADE UNDER PERMIT #400851404-DM ISSUE ON 04-30-98.
#34178185P
Aug 24, 1999
WRITTEN OFF
$0
DOB (10)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00895
DOB VIOLATION - ACTIVE
Jun 15, 2020ELEVATOR

#9027/681986
DOB VIOLATION - ACTIVE
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#05146
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#06083
DOB VIOLATION - ACTIVE
Dec 1, 2016ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
#04868
DOB VIOLATION - ACTIVE
Jun 1, 2016NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#03242
DOB VIOLATION - ACTIVE
Feb 3, 2010CONSTRUCTION

#0801MD
DOB VIOLATION - ACTIVE
Mar 31, 2008EMERGENCY POWER

#NRF01351
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#03955
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#03956
DOB VIOLATION - ACTIVE
DOB NOW Safety (51)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Apr 5, 2019Elevators EVCAT1
Active
Sep 15, 2017Elevators EVCAT1
Active
Dec 1, 2016Elevators EVCAT1
Active
Jun 1, 2016Elevators EVCAT5
Active
Mar 31, 2008Emergency Power FTF-EL-ENRF
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 11:49 PM ET. BBL 4068580001.

Look up another building