Queens · Block 9667 · Lot 1 · 11435

82-30 Hoover Avenue

6 floors · 84 apartments · 64,248 sq ft · built 1952 · class D1 · owner of record: Buckingham Rlty Assoc

25open violations
$17,050ECB/OATH penalties owed
5HPD class C (immediately hazardous)
50dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 50 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 64,248 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9667). Agency page

Dec 31, 2027
in 415 days
Next due 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-28 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (8) · $17,050 owed
IssuedViolationHearingBalance
Nov 18, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39116662R., FILE A CERTIFICATE OF CORRECTION
#39167341X
Jan 27, 2026
IN VIOLATION
$1,250
Nov 18, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39116632X., FILE A CERTIFICATE OF CORRECTION
#39167340Y
Jan 27, 2026
IN VIOLATION
$1,250
Nov 18, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39116623Y., FILE A CERTIFICATE OF CORRECTION
#39167342H
Jan 27, 2026
IN VIOLATION
$1,250
Jun 11, 2024Construction CLASS - 1
ATOI OF APT# 3E, I OBSERVED WORKER ON SITE ACTIVELY PERFORMING PLUMBING WORK AT KITCHEN & BATHROOM WALLS OF THE UNIT. EXISTING FIXTURES, VALVES, & SECTIONS OF COPPER WATER LINES CUT/REMOVED & NEW SECTIONS OF PI
#39116623Y
Aug 20, 2024
IN VIOLATION
$2,500
Jun 11, 2024Plumbing CLASS - 1
ATOI OF OCCUPIED MULTIPLE DWELLING, AT UNIT# 3E I OBSERVED UNPERMITTED ALTERATIONS TO EXISTING PLUMBING SYSTEM. EXISTING FIXTURES, VALVES, FITTINGS & COPPER PIPE REMOVED, REPLACED AND WELDED WITH NEW SECTIONS O
#39116632X
Jan 21, 2025
IN VIOLATION
$2,500
Jun 11, 2024Construction CLASS - 1
ATOI OBSERVED ACTIVE DEMO WORK IN PROGRESS WITH LARGE AMOUNTS OF CONSTRUCTION DEBRIS, DUST, MATERIALS SCATTERED THROUGHOUT APT.# 3E. DEMOLITION OF A KITCHEN WALL & BATHROOM WALL CREATING EXCESSIVE DUST THAT CON
#39116662R
Jan 21, 2025
IN VIOLATION
$2,500
Jun 11, 2024Unknown CLASS - 2
ATOI OBSERVED MULTIPLE ELECTRICAL FIXTURES REMOVED, ELEC WIRES CAPPED AT KITCHEN AND BATHROOM WALLS OF UNIT# 3E. NO EL PERMIT ON FILE WITH DEPT RECORDS AS REQUIRED BY CODE, OBTAIN ALL PERMITS
#39116653P
Aug 20, 2024
IN VIOLATION
$800
Jun 11, 2024Plumbing CLASS - 1
. ATOI OBSERVED WORKER ENGAGED IN PLUMBING ALTERATIONS & INSTALLATION OF NEW VALVES, FITTINGS, COPPER PIPE AT KITCHEN & BATHROOM OF UNIT# 3E. WORKER STATED HE'S EMPLOYED BY JMK PAINTING LLC. EMPLOYMENT BY JMK P
#39116643L
Aug 20, 2024
IN VIOLATION
$5,000
DOB (1)
IssuedViolationStatus
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#04019
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
HPD (20) · C 5 · B 12 · A 3
IssuedClassViolationCorrect by
Dec 30, 2025CApt 6D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHDec 30, 2025
Dec 30, 2025BApt 6D · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 3, 2026
Apr 14, 2023BApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 19, 2023
Apr 14, 2023BApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 19, 2023
Mar 13, 2023BApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 17, 2023
Mar 13, 2023BApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 17, 2023
Mar 13, 2023AApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 16, 2023
Mar 13, 2023BApt 6E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 17, 2023
Mar 13, 2023BApt 6E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 17, 2023
Mar 13, 2023BApt 6E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 17, 2023
Mar 13, 2023BApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 17, 2023
May 23, 2022B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''82-30''Jun 27, 2022
May 23, 2022A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYAug 26, 2022
May 23, 2022A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''82-30''Aug 26, 2022
May 23, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''82-30''Jun 27, 2022
May 23, 2022BApt 6K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''82-30''Jun 27, 2022
Jan 12, 2000CApt 2D · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. ceiling NORTH CEILING, NORTH WALL, EAST WALL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORYFeb 12, 2000
Jan 12, 2000CApt 2D · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. Kitchen Door Frame EAST DOOR FRAME IN THE KITCHEN LOCATED AT APT 2D, 2nd STORYFeb 12, 2000
Jan 12, 2000CApt 2D · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. NorthWest Room EAST WALL, EAST CEILING, EAST DOOR FRAME IN THE BATHROOM LOCATED AT APT 2D, 2nd STORYFeb 12, 2000
Jan 12, 2000CApt 2D · § 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. At Ceiling EAST CEILING, SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2D, 2nd STORYFeb 12, 2000

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 2:52 PM ET. BBL 4096670001.

Look up another building