Manhattan · Block 1317 · Lot 21 · 10017

815 2 Avenue

11 floors · 137,784 sq ft · built 1963 · class O3 · owner of record: Protestant Missions

7open violations
$10,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
66dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 66 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 137,784 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1317). Agency page

Dec 31, 2027
in 431 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $51,300 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 483 days
No Cycle 10 report on record yet

Open violations

ECB / OATH (3) · $10,000 owed
IssuedViolationHearingBalance
Nov 1, 2021Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN EXIST
#37022683X
Mar 17, 2022
IN VIOLATION
$0
Mar 30, 2020Construction CLASS - 2
27-929.1 A.C.*27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BLDG
#37018939Z
Jan 21, 2021
DEFAULT
$10,000
Nov 15, 2019Construction CLASS - 2
AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY,1,2019,IN AN OFFICE BUILDING 100 FEE
#37016658N
Feb 27, 2020
IN VIOLATION
$0
DOB (3)
IssuedViolationStatus
Jul 7, 2026CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. OBSERVED BUILDING WITHIN COLLAPSE ZONE OF 235 EAST 42ND STREET WHERE STRUCTURAL STEEL ELEMENTS HAVE FAILED IN DANGER OF COLLAPSING.
#26-01723
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00621
DOB VIOLATION - ACTIVE
Apr 25, 1991LOCAL LAW 5/73

#P30193
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 7, 2026DOBCONSTRUCTION: STRUCTURE RENDERED NON-COMPLIANT. OBSERVED BUILDING WITHIN COLLAPSE ZONE OF 235 EAST 42ND STREET WHERE STRUCTURAL STEEL ELEMENTS HAVE FAILED IN DANGER OF COLLAPSING.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 8:58 AM ET. BBL 1013170021.