Bronx · Block 2681 · Lot 18 · 10459

812 East 168 Street

3 floors · 4 apartments · 3,654 sq ft · built 1910 · class C3 · owner of record: Medina, Armando

4open violations
$12,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 775 days
Next cycle year 2028

Open violations

ECB / OATH (5) · $12,500 owed
IssuedViolationHearingBalance
Sep 16, 2026Construction CLASS - 2
ILLEGAL USE IN RESIDENTIAL DISTRICT : NOTED : AT REAR BACK YARD OF PROPERTY AT EXPOSURE #3 WITH 2 CHEVY COMMERCIAL VEHICLES WITH ONE WITH NO PLATES OR TAGS CREATING DEAD STORAGE & THE OTHER WITH COMMERCIAL TAGS
#39204420Y
Nov 20, 2026
PENDING
$1,250
Sep 16, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER : NOTED : INSTALLATION OF AN ILLEGAL DOUBLE KEYED DEADBOLT LOCK AT EXPOSURE # 3 REAR OF HOUSE AT STREET LEVEL APARTMENT THAT WAS LOCKED AT THE TIME OF INSPE
#39204419R
Nov 20, 2026
PENDING
$1,250
Aug 18, 2026Construction CLASS - 1
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGE WAY : NOTED : C OF C IS NON COMPLIANT DUE TO PADLOCK ON WROUGHT IRON GATE AT DRIVEWAY ENTRANCE AT EXPOSURE # 1 STREET LEVEL ., REMOVE OBSTRUCTION
#39204415J
Nov 20, 2026
PENDING
$6,250
Aug 18, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER : NOTED INSTALLATION OF AN ILLEGAL LOCKABLE SLIDE DEAD BOLT ON AN EMERGENCY EGRESS ACCESS POINT AT BASEMENT LEVEL ON A SOLID WROUGHT IRON GATE WITH NO POSSI
#39200961Z
Dec 14, 2026
PENDING
$1,250
Apr 19, 2026Construction CLASS - 1
SUMMONS ISSUED FOR FAILURE TO PROVIDE UNOBSTRUCTED PASSAGEWAY DUE EXIT PASSAGEWAY PARTIALLY OBSTRUCTED DUE TO EXIT GATE LOCKED WITH A PADLOCK., REMOVE OBSTRUCTION
#39185148N
Jan 22, 2027
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026ECBConstruction: ILLEGAL USE IN RESIDENTIAL DISTRICT : NOTED : AT REAR BACK YARD OF PROPERTY AT EXPOSURE #3 WITH 2 CHEVY COMMERCIAL VEHICLES WITH ONE WITH NO PLATES OR TAGS CREATING DEAD STORAGE & THE OTHER WITH COMMERCIAL TAGSOpen
Sep 16, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER : NOTED : INSTALLATION OF AN ILLEGAL DOUBLE KEYED DEADBOLT LOCK AT EXPOSURE # 3 REAR OF HOUSE AT STREET LEVEL APARTMENT THAT WAS LOCKED AT THE TIME OF INSPEOpen
Aug 18, 2026ECBConstruction: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGE WAY : NOTED : C OF C IS NON COMPLIANT DUE TO PADLOCK ON WROUGHT IRON GATE AT DRIVEWAY ENTRANCE AT EXPOSURE # 1 STREET LEVEL ., REMOVE OBSTRUCTIONOpen
Aug 18, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER : NOTED INSTALLATION OF AN ILLEGAL LOCKABLE SLIDE DEAD BOLT ON AN EMERGENCY EGRESS ACCESS POINT AT BASEMENT LEVEL ON A SOLID WROUGHT IRON GATE WITH NO POSSIOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 3:18 AM ET. BBL 2026810018.

Look up another building