6 floors · 51 apartments · 46,204 sq ft · built 1958 · class D1 · owner of record: 810 Pelham Parkway Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,204 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. AS NOTED: AT THE TIME OF INSPECTOM I OBSERVED ON EXPOSURE #1 AND 2 NORTH AND EAST ELEVATION SEVERE CRACKS AND STEP CRACKS SPALLING AND MISSING MORT #35689220M | Jan 27, 2026 IN VIOLATION | $2,500 |
| Nov 20, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE AT TIME OF INSPECTION, I OBSERVED EXP #1 SOUTH, #2 WEST-EXP #3 NORTH VERTICAL CRACKED BRICK AT SPANDRELS MULTI LOC. ROOF CRACKED BRICK CHIMNEY, B #35687021K | Dec 12, 2025 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Dec 3, 2024 | IMMEDIATE EMERGENCY IMMEDIATELY INSTAL 150' LINEAR FEET SIDEWAL SHED @ EXPO#1 ON PELHAM PA RKWAY SOUTH AND 100' LINEAR FEET OF SIDEWALK SHED EXPO#2 ON MATTHEWS AVE TO PROTECT AND SECURE PUBIC SAFETY #18853 | DOB VIOLATION - ACTIVE |
| Nov 20, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO SEVERE STEP CRACKED BRICK @ PARAPET LEVEL EXP1 SOUTH,#2 WEST POSING AN IMMINENT HAZARD TO PUBLIC. REMEDY: IMMEDI TAKE & PROVIDE ADEQUATE SAFETY MEASURES TO SECURE & PROTECT THE PUBLIC & INSTALL PUB PROTECTION @ EXP#1S(PELHAM PKWYS= S),EXP#2 W (MATHEWS AV ADDITIONALLY MAKE #FA21102DD | DOB VIOLATION - ACTIVE |
| Nov 10, 2021 | ELEVATOR #9027/711085 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #04960 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #05117 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 31, 2024 | A | Apt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | May 5, 2024 |
| Jan 31, 2024 | A | Apt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | May 5, 2024 |
| Jan 31, 2024 | A | Apt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 2nd DOOR FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | May 5, 2024 |
| Jun 7, 2021 | C | Apt 1 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jul 1, 2021 |
| Jun 4, 2021 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jun 8, 2021 |
| Jun 4, 2021 | C | Apt 1F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ...... IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 8, 2021 |
| Jun 1, 2021 | C | Apt 6E · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jun 5, 2021 |
| Jun 15, 2020 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 11, 2020 |
| May 11, 1993 | A | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE SUPPORT AT SINK CABINET 1ST STY WEST WALKIN APT B KITCHEN. | Aug 27, 1993 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 6:25 AM ET. BBL 2043220038.