1 floors · 10,000 sq ft · built 1958 · class G2 · owner of record: 81 Steuben Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 12, 2023 | CONSTRUCTION FTM.THE EXP2WALL OD 81 STEUBEN ST HAD SPALLED,&THE MOTOR JOINTS WERE HEAVILY DETERIORATED,W/SOME JOINTS MISSING IN CERTAIN AREAS.ADDITIONLY CRCKS WERE OBSRVD ON THE BRICKS.OWNR TO IMMED RTAIN NYS PE TO EVAL THE ENT BLDG,DETERMINE THE STRCTRL STBILITY OF THE BLDG.SUBMIT ON ENGINEER'S REPORT #FEU30201ZT | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 4:04 AM ET. BBL 3018940011.