2 floors · 2,400 sq ft · built 1931 · class K2 · owner of record: 8120 Roosevelt, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-11 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 27, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39122134Y., FILE A CERTIFICATE OF CORRECTION #39197734Y | Oct 6, 2026 ADMIT/IN-VIO | $0 |
| Jul 2, 2025 | Construction CLASS - 2 FAILURE TO CERTIFY CERTIFICATE OF CORRECTION FOR VIOLATION # 39122134Y, FILE A CERTIFICATE OF CORRECTION #39152591R | Sep 9, 2025 ADMIT/IN-VIO | $0 |
| Aug 15, 2024 | Construction CLASS - 1 WORK W/O PERMIT-AT TIME OF INSPECTION OBSERVED METAL AND PLEXIGLASS STRUCTURE (SMOOTHIE STORE) WITH NO STRUCTURAL STABILITY ATTESTED FOR WITH ELECTRICAL COMPONENTS ATTACHED TO BUILDING FACADE AT EXP. 1., OBTAIN #39122134Y | Mar 25, 2025 IN VIOLATION | $0 |
| Apr 14, 2023 | Construction CLASS - 1 FILE A CERTIFICATE OF CORRECTION OR OTHER RELATED MATERIALS CONTAINING MATERIAL FALSE STATEMENT(S) OF BUILDINGS. RESPONDENT FAILED TO COMPLY WITH COMMISSIONERS ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35669047J | Feb 5, 2024 DEFAULT | $12,500 |
| Apr 14, 2023 | Construction CLASS - 1 FILE A CERTIFICATE OF CORRECTION OR OTHER RELATED MATERIALS CONTAINING MATERIAL FALSE STATEMENT(S) OF BUILDINGS. RESPONENT FAILED TO COMPLY WITH COMMISSIONERS ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35669048L | Feb 5, 2024 DEFAULT | $12,500 |
| Jan 8, 2010 | Construction CLASS - 3 WORK DOES NOT CONFORM TO CONST DOCUMENTS &/OR APPROVED AMENDMENTS FOR ALTII JOB#410055871 PLAN DATED 01/17/08 PERMIT EXPIRED 11/09/08 NON CPNFORMING NOTED:1-FOUND A HAND SINK @ END OF WOR COUNTER-NOT ON PLACE #34712677Z | Aug 3, 2010 DEFAULT | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 27, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39122134Y., FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 4:41 PM ET. BBL 4014920010.