2 floors · 2 apartments · 7,400 sq ft · built 1931 · class F9 · owner of record: Amar 81-11 101 Ave. Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 60 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-07 (Accepted). Agency page | Dec 31, 2026 in 60 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #30699 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #24391 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Jun 28, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 17, 2022 | B | Apt 2R · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2022 |
| Nov 17, 2022 | C | Apt 2R · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 16, 2022 |
| Nov 17, 2022 | B | Apt 2R · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2022 |
| Nov 17, 2022 | B | Apt 2R · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2022 |
| Nov 17, 2022 | B | Apt 2R · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2022 |
| Nov 17, 2022 | B | Apt 2R · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 22, 2022 |
| Jan 31, 2019 | B | Apt 2R · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 7, 2019 |
| Jan 31, 2019 | B | Apt 2R · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 7, 2019 |
| Jan 31, 2019 | A | Apt 2R · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | May 6, 2019 |
| Jan 31, 2019 | B | Apt 2R · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 7, 2019 |
| Jan 31, 2019 | C | Apt 2R · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF LOCKABLE SLIDEBOLT INSTALLED AT DOOR IN THE ENTRANCE LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 8, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 4:33 AM ET. BBL 4090520034.