6 floors · 78 apartments · 82,320 sq ft · built 1927 · class D1 · owner of record: Adee Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 82,320 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 434 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4550). Agency page | Dec 31, 2030 in 1530 days | Next due 2030 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 22, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. I OBSERVED CONDITIONS IN MULTIPLE AREAS WITH THE PARAPET WALL OF THE BLDG. WITH MORTAR CRACKS AROUND BRICKS, BROKEN OR LOOSE BRICKS DAMAGE OR MISSING COP #35683161Y | Jul 18, 2025 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2025 | CONSTRUCTION EMERGENCY WORK ORDER-OBSVD THAT ONE OF THE REAR FIRE ESCAPE CONNECTION WAS FOUND T/BE LOOSE & UNSTABLE W/CRACKED BRICKS @ PARAPET LEVEL @ THE EXP3 WALL. OWNER TO IMMED RETAIN NYSPE & DOB REG CONTRACTOR TO SECURE THE UNSTABLE REAR FIRE ESCAPE CONNECTIONS. PE T/BE ON SITE FULL TIME PROVIDING EMERGENCY #PI21101ZT | DOB VIOLATION - ACTIVE |
| Apr 22, 2025 | CONSTRUCTION EMERG WORK ORDER FOR S/W SHED PROTECTION. OBSV DETERIORATED MORTAR AROUND EXTERIOR BRICKS,CRACKED BRICKS,CRACKED MORTAR,LOOSE BRICKS, LEANING PARAPET WALLS,MISSING BRICKS OVER DOORWAY,DEFECTS IN VARIOUS AREAS OF BLDG. INSTALL OVERHEAD PROTECTION ALONG THE PERIMETER OF ALL BLDGS AND ALL EXTERIOR SIDE #PI21101HZ | DOB VIOLATION - ACTIVE |
| Apr 22, 2025 | CONSTRUCTION CORRECTION ACTION PLAN REQ'D. OBSV HAZ COND IN MULT AREAS W/EXTERIOR PARAPET WALLS AT THE BLDG, WITH MORTAR CRACKS AROUND BRICKS,BROKEN OR LOOSE BRICKS,DAMAGE/MISSING COPPING STONE LEANING PARAPET WALL SECTION OWNER TO HIRE REG DESIGN PROF TO SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS. #PI21102HZ | DOB VIOLATION - ACTIVE |
| Dec 1, 2024 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2400944 | DOB VIOLATION - ACTIVE |
| Dec 1, 2023 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2300961 | DOB VIOLATION - ACTIVE |
| Dec 1, 2022 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2200939 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101959 | DOB VIOLATION - ACTIVE |
| Nov 26, 2021 | ELEVATOR #9027/711044 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2002717 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Dec 1, 2024 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Dec 1, 2023 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Dec 1, 2022 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 2, 2022 | A | Apt 3CA · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3CA, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Jun 5, 2022 |
| Mar 2, 2022 | B | Apt 4K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2022 |
| Mar 2, 2022 | B | Apt 4K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2022 |
| Mar 2, 2022 | B | Apt 3CA · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 3CA, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2022 |
| Mar 2, 2022 | B | Apt 3CA · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3CA, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2022 |
| Mar 2, 2022 | B | Apt 3CA · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 3CA, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2022 |
| Mar 2, 2022 | B | Apt 3CA · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES ... IN THE BATHROOM LOCATED AT APT 3CA, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2022 |
| Mar 2, 2022 | B | Apt 4K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2022 |
| Mar 2, 2022 | A | Apt 3CA · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3CA, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Jun 5, 2022 |
| Oct 26, 2020 | C | Apt 3CA · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3CA, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Nov 21, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 9:07 AM ET. BBL 2045500027.