7 floors · 65 apartments · 104,722 sq ft · built 1982 · class RM · owner of record: Broadway 11 Owners Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 104,722 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 557). Agency page | Dec 31, 2027 in 434 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 486 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-10 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 7, 2025 | C | Apt 5L · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | B | Apt 5L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURES AT CEILING IN THE KITCHEN LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 12, 2025 |
| Apr 7, 2025 | B | Apt 5L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET SWITCH AT WEST WALL IN THE KITCHEN LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 12, 2025 |
| Apr 7, 2025 | B | Apt 5L · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SINK IN THE KITCHEN LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 12, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR FIRE RETARDANT MATERIAL AT CEILING, NORTH, SOUTH, WEST, AND EAST WALLS IN THE BATHROOM LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR FIRE RETARDANT MATERIAL AT CEILING, SOUTH AND NORTH WALLS IN THE FOYER LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR FIRE RETARDANT MATERIAL AT CEILING, NORTH, SOUTH, EAST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | B | Apt 5L · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 12, 2025 |
| Apr 7, 2025 | B | Apt 5L · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 12, 2025 |
| Apr 7, 2025 | B | Apt 5L · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER TO ELECTRICAL OUTLET AT NORTH AND SOUTH WALLS IN THE 3rd ROOM FROM EAST LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 12, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR FIRE RETARDANT MATERIAL AT CEILING, NORTH, SOUTH, EAST AND WEST WALL INSIDE CLOSET. IN THE 3rd ROOM FROM EAST LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
| Apr 7, 2025 | C | Apt 5L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR FIRE RETARDANT MATERIAL AT CEILING, NORTH, SOUTH, WEST AND EAST WALLS IN THE 3rd ROOM FROM EAST LOCATED AT APT 5L, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 13, 2025 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 5:07 AM ET. BBL 1005577501.