6 floors · 68,787 sq ft · built 1967 · class I6 · owner of record: Jay S. Colen Revocable Trust
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-10-01 (Accepted). Agency page | Dec 31, 2026 in 45 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 68,787 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2180). Agency page | Dec 31, 2030 in 1506 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 19, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.AT TIMEOF INSPECTION OBSERVED AT EXPOSURE 1 LOOSE BRICK LOCATED SOUTH ELEVATION LOOSE MORTAR JOINTS/SEPARATION OF MORTAR JOINTS LEAVING GABS TOWARD #35682390N | Jun 27, 2024 IN VIOLATION | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #916676. REMEDY: SUBMIT ACCEPTABLE REQU #37028258M | Aug 15, 2024 IN VIOLATION | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #816676. REMEDY: FILE ACCEPTABLE REPORT. #37026819Y | May 2, 2024 IN VIOLATION | $0 |
| Jun 23, 2021 | Boilers CLASS - 2 FOUND ÝDOMINQTOR¨ RBI HOT WATER HEATER WITH H-STAMP SERIAL # 070953668 , BTU 900,000 YR 2008 NOT REGISTERED WITH THIS DEPT. #39043278H | Aug 12, 2021 STIPULATION/IN-VIO | $0 |
| Oct 10, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: EXP1 SOUTH ELEVATION OBSERVED DEFECTIVE MASONRY FACADE SUCH AS BULGING DISPLACING SHIFTING MASONRY FACADE ALSO OBSERVE CRACK/SPALLED/DETERIO #35365104Y | Feb 14, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 9, 2026 | CONSTRUCTION FAILURE TO MAINTAIN WALLS AND APPURT. OBSERVED SPALLING/CRACKING CONCRETE BEAMS, EXPOSED REBAR, RUSTED REBAR, STEPCRACKS, LOOSE BRICKS, MISSING BRICKS, OPEN MORTAR JOINTS, DEFECTED MORTAR JOINTS AT EXPOSURE SOUTH ELEVATIONS. REMEDY: OWNER TO REPAIR AND/OR REPLACE #SR11206YC | DOB VIOLATION - ACTIVE |
| Sep 24, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER AS PER NYC ADMIN CODE. OBSERVED @ EXP1 DAMAGED & DETERIORATED BRICK & MASONRY AT FOUNDATION LEVEL. OBSERVED @ ROOF BULKHEAD HAS STEP CRACKS AND SPALLING, EXPOSED AND DETERIORATED MASONRY. REMEDY: REPAIR AND/OR FIX #SR1203BB | DOB VIOLATION - ACTIVE |
| Jun 26, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00032 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #35574 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #14658 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00882 | DOB VIOLATION - ACTIVE |
| Dec 1, 2022 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2200545 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101244 | DOB VIOLATION - ACTIVE |
| Jun 2, 2021 | CONSTRUCTION FALUIRE TO COMPLY. ON 10/11/18 COMMISSIONER'S ORDER 313059 (101118CLLF02AV)WAS ISSUED TO OWNER TO HAVE 100% OF STREET FACADE IMMED INSPECTED, HANDS ON BY NYS LIC PROF. AS OF 6/2/21 OWNER HAS NOT COMPLIED WITH IMMED CURE ORDER TO HAVE FACADES INSP AND PROV. ENG'R REPORT & REPAIR DWGS. REMEDY: COMPLY #LL1201LS | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2001605 | DOB VIOLATION - ACTIVE |
| May 13, 2019 | FACADE SAFETY PROGRAM #HAZ81667 | DOB VIOLATION - ACTIVE |
| Oct 11, 2018 | CONSTRUCTION #VAC120/2018 | DOB VIOLATION - ACTIVE |
| Oct 11, 2018 | CONSTRUCTION FTM EXTERIOR BUILDING FACADE & APPURTENANCE. CRACK/SPALLED/DETERIORATE D MASONRY/DISPLACMENT MASONRY FACADES AT VARIOUS LOCATION/FLOOR AT EXPOSURE #1/SOUTH ELEVATION EXPOSURE #4, EAST ELEVATION ALSO FALLING DEBRIS FROM FACADE. OWNER TO IMMED' INSPECT 100% OF BLDG FACADE & PROV IDE ENG'R REPORT & REP #LLF02AV | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #04165 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #02901 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 26, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Dec 1, 2022 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| May 13, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 9:36 PM ET. BBL 1021800570.