Manhattan · Block 1104 · Lot 1 · 10019

800 Joe Dimaggio Highway

4 floors · 167,700 sq ft · built 1940 · class Y6 · owner of record: Nyc Department Of Sanitation

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
60dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 60 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 167,700 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1104). Agency page

Dec 31, 2034
in 2982 days
Next due 2034

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Sep 2, 2026Unknown CLASS - 1
FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE OCCUPIED PARKING STRUCTURE CONSISTING OF CELLAR LEVEL, CRACKING ALONG CMU BLOCK MASONRY WALLS AND MISSING FIR
#35730126H
Sep 28, 2026
POP/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#04572
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#00920
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
Dec 4, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A parking structures compliance report by 12/31/2023, as required per 1 RCNY 103-13.
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 2, 2026ECBUnknown: FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE OCCUPIED PARKING STRUCTURE CONSISTING OF CELLAR LEVEL, CRACKING ALONG CMU BLOCK MASONRY WALLS AND MISSING FIROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 3:23 PM ET. BBL 1011040001.