4 floors · 182,000 sq ft · built 1974 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 182,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2671). Agency page | Dec 31, 2031 in 1886 days | Next due 2031 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 9, 2026 | Construction CLASS - 2 REISSUE#35693286R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:IN BASEMENT THE EXIT SIGNS ABOVE GYM DOORS & AT STA #35731972L | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FPSC INTERIOR DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR-STAIRCASE F.2ND FLR-STAIRCASE A AUDITORIUM DOORS.CLASSROOM DOORS DO NOT SELF CLOSE PROPERLY #35731974P | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED:IN SUBCELLAR,GAS METER ROOM IS MISSING FIRE-STOPPING AROUND PIPES THAT GO THRU CMU BLOCKS ABOVE ENTRANCE.REM:PROVI #35734150X | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 REISSUE#35693285P FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTED:ON THE ROOF AT STAIRCASE A BULKHEAD EXTERIOR WALL HAS VERTICAL CRACKS IN BRICKS,PARAPET WALLS HAVE STEP-CRACKS IN SEVERAL LOCATIONS TH #35731973N | Aug 7, 2026 POP/IN-VIO | $0 |
| Aug 19, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED PER BC 1006.1; 27-381. AT THE TIME O #35693286R | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 19, 2025 | Construction CLASS - 2 REISSUE: 35679074Y DATE OF ISSUE: 08-19-25. FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT ROOF LEVEL STAIRCASE "A" BULKHEAD HAS VERTICAL CRACKS IN BULKHE #35693285P | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 27, 2024 | Construction CLASS - 2 REISSUE#FAILURE TO MAINTAIN BUILDING WALL(S)ON APPURTENANCES AT ROOF LEVEL BY STAIRCASE A BULKHEAD HAS VERTICAL CRACKS IN BRICKS.RE-ISSUE 35672143R.REM:COMPLY WITH CODE. #35679074Y | Nov 1, 2024 POP/IN-VIO | $0 |
| Jan 20, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.AT TIME OF INSPECTION AT ROOF LEVEL BY STAIRCASE A BULKHEAD OBSERVED A VERTICAL CRACK INPARAPET WALL,RUNNING ALONG ENTIRE HEIGHT OF THE PARAPET WALL.REM:MAINT #35672143R | May 5, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05920 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05919 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05918 | DOB VIOLATION - ACTIVE |
| May 1, 2024 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00016 | DOB VIOLATION - ACTIVE |
| Dec 17, 2002 | ELEVATOR 2P4704 #9013/166234 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 23, 2025 | Retaining Walls | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 9, 2026 | ECB | Construction: REISSUE#35693286R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:IN BASEMENT THE EXIT SIGNS ABOVE GYM DOORS & AT STA | Open |
| Jul 9, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FPSC INTERIOR DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR-STAIRCASE F.2ND FLR-STAIRCASE A AUDITORIUM DOORS.CLASSROOM DOORS DO NOT SELF CLOSE PROPERLY | Open |
| Jul 9, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED:IN SUBCELLAR,GAS METER ROOM IS MISSING FIRE-STOPPING AROUND PIPES THAT GO THRU CMU BLOCKS ABOVE ENTRANCE.REM:PROVI | Open |
| Jul 9, 2026 | ECB | Construction: REISSUE#35693285P FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTED:ON THE ROOF AT STAIRCASE A BULKHEAD EXTERIOR WALL HAS VERTICAL CRACKS IN BRICKS,PARAPET WALLS HAVE STEP-CRACKS IN SEVERAL LOCATIONS TH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)