Brooklyn · Block 6511 · Lot 1 · 11230

800 Avenue H

6 floors · 67 apartments · 74,600 sq ft · built 1938 · class D1 · owner of record: 800 Midwood Llc

39open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
66dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-06 (Accepted). Agency page

Dec 31, 2026
in 66 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 74,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 310 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 431 days
Next cycle year 2027
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6511). Agency page

Dec 31, 2031
in 1892 days
Next due 2031

Open violations

ECB / OATH (0)

None open.

DOB (4)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#09242
DOB VIOLATION - ACTIVE
Sep 7, 2021ELEVATOR

#9028/706970
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#06608
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#08428
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 30, 2019Facades FISPNRF
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
HPD (28) · C 6 · B 18 · A 4
IssuedClassViolationCorrect by
Apr 4, 2025CApt 1D · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AMay 12, 2025
Apr 3, 2025BApt 1D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTMay 8, 2025
Apr 3, 2025BApt 1D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTMay 8, 2025
Apr 3, 2025CApt 1D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTEN WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTApr 9, 2025
Apr 3, 2025CApt 1D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WESMay 11, 2025
Apr 3, 2025BApt 1D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LOCK IN THE ENTRANCE LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTMay 8, 2025
Mar 31, 2025BApt 1D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILES AT FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMay 5, 2025
Mar 27, 2025CApt 1D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTApr 22, 2025
Mar 27, 2025BApt 1D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTMay 1, 2025
Oct 8, 2024BApt 3J · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTNov 12, 2024
Oct 8, 2024BApt 3J · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTNov 12, 2024
Oct 23, 2023AApt 2F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHJan 26, 2024
Apr 11, 2023CApt 5A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHMay 7, 2023
Jul 13, 2021BApt 4G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT 1ST WINDOW AT NORTH, TOTAL 3 SQ FT IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 14073435 ISSUED 13-MAR-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE Aug 17, 2021
Apr 14, 2021CApt 4G · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 4G, 4th STORY, 3rd APARTMMay 8, 2021
Mar 15, 2021BApt 4G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 19, 2021
Jul 20, 2015BApt 4J · SECTION 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE .. IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTAug 24, 2015
Jun 25, 2015BApt 4J · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJul 30, 2015
Jun 25, 2015BApt 4J · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJul 30, 2015
May 15, 2015AApt 4J · SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTAug 18, 2015
May 15, 2015BApt 4J · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 19, 2015
May 15, 2015BApt 4J · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST AND NORTH WALLS IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 19, 2015
Aug 25, 2008BApt 1M · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT FLOOR IN SHOWER STALL LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHSep 29, 2008
Aug 25, 2008BApt 1M · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AT CLOSET IN PRIVATE HALL. IN THE PRIVATE HALLWAY LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHSep 29, 2008
Aug 4, 2006AApt 2B · SECTION 27-2005 ADM CODE REFIT ENTRANCE DOOR LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WESTNov 12, 2006
Aug 4, 2006AApt 2B · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WESTNov 12, 2006
Aug 4, 2006BApt 2B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE FOYER LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WESTSep 13, 2006
Aug 4, 2006BApt 2B · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WINDOW GLASS BOTTOM SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WESTSep 13, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 10:10 AM ET. BBL 3065110001.

Look up another building