41 floors · 526,124 sq ft · built 1970 · class O4 · owner of record: 800 Third Avenue Associates, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $57,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 118 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 526,124 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1304). Agency page | Dec 31, 2034 in 2988 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 20, 2026 | Unknown CLASS - 1 FAILURE TO CARRY OUT DEMOLITION OPERATIONS AS PER FIRE CODE. AT TIME OF INSPECTION PREMISES IN 800 THIRD AVENUE WITH 41 STORIES OBSERVED IN STORY NUMBER 35 DEMOLITION WORK BEING PERFORMED WITHOUT THE REQUIRED E #35721950L | May 20, 2027 PENDING | $1,250 |
| Jul 20, 2026 | Unknown CLASS - 1 FAILURE TO MAINTAIN RECORD OF PRE-SHIFT SAFETY MEETING FOR EACH WORKER. AT TIME OF INSPECTION, PREMISES IN 800 THIRD AVENUE WITH 41 STORIES OBSERVED DEMOLITION WORKS IN PROGRESS WITHOUT REQUIRED PRE-SHIFT SAFET #35721952P | May 20, 2027 PENDING | $5,000 |
| Jul 20, 2026 | Site Safety CLASS - 1 FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENTAT SITE AS REQUIRED. AT TIME OF INSPECTION, PREMISES IS 800 THIRD AVENUE WITH 41 STORIES DEMOLITION WORK WAS IN PROGRESS WITHOUT THE PROPER #35721951N | May 20, 2027 PENDING | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00593 | DOB VIOLATION - ACTIVE |
| Aug 12, 2008 | ELEVATOR #9011/272129 | DOB VIOLATION - ACTIVE |
| Mar 1, 2000 | ELEVATOR #9444 | DOB VIOLATION - ACTIVE |
| Jul 7, 1989 | LOCAL LAW 5/73 #C30328 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 20, 2026 | ECB | Unknown: FAILURE TO CARRY OUT DEMOLITION OPERATIONS AS PER FIRE CODE. AT TIME OF INSPECTION PREMISES IN 800 THIRD AVENUE WITH 41 STORIES OBSERVED IN STORY NUMBER 35 DEMOLITION WORK BEING PERFORMED WITHOUT THE REQUIRED E | Open |
| Jul 20, 2026 | ECB | Unknown: FAILURE TO MAINTAIN RECORD OF PRE-SHIFT SAFETY MEETING FOR EACH WORKER. AT TIME OF INSPECTION, PREMISES IN 800 THIRD AVENUE WITH 41 STORIES OBSERVED DEMOLITION WORKS IN PROGRESS WITHOUT REQUIRED PRE-SHIFT SAFET | Open |
| Jul 20, 2026 | ECB | Site Safety: FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENTAT SITE AS REQUIRED. AT TIME OF INSPECTION, PREMISES IS 800 THIRD AVENUE WITH 41 STORIES DEMOLITION WORK WAS IN PROGRESS WITHOUT THE PROPER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 10:03 AM ET. BBL 1013040033.