Manhattan · Block 868 · Lot 7502 · 10016

80 Park Avenue

20 floors · 224 apartments · 185,140 sq ft · built 1956 · class RM · owner of record: 80 Park Condo Inc

34open violations
$13,627ECB/OATH penalties owed
0HPD class C (immediately hazardous)
63dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 63 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 185,140 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $34,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 480 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 868). Agency page

Dec 31, 2028
in 794 days
Next due 2028
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $13,627 owed
IssuedViolationHearingBalance
Jan 28, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT TIME OF INSPECTION NO PERMITS ON FILE. FAILURE TO COMPLY WITH VIOLATION #39102319M ISSUED ON 12/28/23. FOR WORK WITHOUT PERMIT, COMPLY WITH COMMISS
#39175200M
May 14, 2026
IN VIOLATION
$6,250
Sep 5, 2025Construction CLASS - 1
FAILURE TO COMPLY AND CERTIFY CORRECTION FOR VIOLATION #39102319M ISSUED ON 12/28/23. FOR WORK WITHOUT PERMIT., COMPLY WITH COMMISSIONER'S ORDER
#39159374M
Nov 13, 2025
IN VIOLATION
$2,500
Dec 28, 2023Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED GARAGE IN A STATE OF DISREPAIR WITH LOOSE CONCRETE DISLODGED FROM REBAR AND BULGING., REPAIR AND/REPLACE
#39102320J
Mar 7, 2024
DEFAULT
$4,877
DOB (4)
IssuedViolationStatus
Mar 26, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT CELLAR LEVEL USED AS PUBLIC GARAGE CONCRETE SLAB IN DISREPAIR WITH SEVERE SPALLING EXPOSING CORRODED STEEL REINFORCEMENT AT MULTIPLE AREA'S. STRUCTURAL STABILITY POTENTIALLY COMPROMISED.
#26-00884
DOB VIOLATION - ACTIVE
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2400211
DOB VIOLATION - ACTIVE
Dec 28, 2023CONSTRUCTION
FAILURE TO MAINTAIN BUILDING. OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERT INSPECTIONS@BUILDINGS.NYC.GOV WITH IN 5 DAYS ADDRESSING ALL CONDITIONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED.
#23-03399
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01333
DOB VIOLATION - ACTIVE
DOB NOW Safety (22)
IssuedViolationStatus
Dec 31, 2024Parking Structures FTC-PS-UNSAFE
Unsafe report of parking structures filed.
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
HPD (5) · C 0 · B 4 · A 1
IssuedClassViolationCorrect by
Nov 5, 2018BApt 10D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 10D, 10th STORYDec 10, 2018
Nov 5, 2018BApt 10D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH AND WEST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 10D, 10th STORYDec 10, 2018
Nov 5, 2018AApt 10D · § 27-2005 ADM CODE REFIT THE ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 8, 2019
Aug 18, 2009BSECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OFFENSIVE ODORS EMANATING FROM 7 STY 3 FROM WEST AT NORTH ATP 7ASep 22, 2009
Aug 18, 2009BApt 7A · SECTION 27-2010, 2011, 2012 ADM CODE CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE 7 STY 3 FROM WEST AT NORTH APT 7A THRU OUT LOCATED AT APT 7ASep 22, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 2:32 PM ET. BBL 1008687502.

Look up another building