Manhattan · Block 42 · Lot 7501 · 10005

80 Maiden Lane

26 floors · 487,058 sq ft · built 1912 · class R0 · owner of record: Maple 80 Maiden Minority Owner, Llc

27open violations
$7,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
186dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 487,058 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 796 days
Next cycle year 2028
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $584,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 848 days
Filing window not open yet
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 42). Agency page

Dec 31, 2032
in 2257 days
Next due 2032

Open violations

ECB / OATH (5) · $7,500 owed
IssuedViolationHearingBalance
Aug 31, 2026Construction CLASS - 2
NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-MAINTAIN VIOLATION #39177843P ISSUED 2/19/2026, CITING DAMAGED/REVERSED SPRINKLER HEADS, NO GAS SHUTOFF VALVE BEHIND GRILL, AND IMPROPERLY
#39202444J
Nov 5, 2026
PENDING
$1,250
Aug 31, 2026Construction CLASS - 2
NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-GROUND ELECTRICAL SYSTEMS VIOLATION #39177858H ISSUED 2/19/2026, CITING THE MAIN ELECTRICAL SYSTEM IN THE BASEMENT NOT GROUNDED TO THE MAIN
#39202445L
Nov 5, 2026
PENDING
$1,250
Aug 31, 2026Construction CLASS - 2
NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-MAINTAIN VIOLATION #39177844R ISSUED 2/19/2026, CITING A WASTE LINE IN THE DEDICATED HIGH-VOLTAGE ELECTRICAL ROOM AND PIPES PENETRATING WAL
#39202443H
Nov 5, 2026
PENDING
$1,250
Aug 31, 2026Construction CLASS - 2
NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-INSTALL GROUNDING VIOLATION #39177857X ISSUED 2/19/2026, CITING NO GROUNDING ELECTRODE/GROUND ROD INSTALLED IN THE BASEMENT MAIN ELECTRICAL
#39202446N
Nov 5, 2026
PENDING
$1,250
May 28, 2026Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION OBSERVED AT EXP #2(EAST ELEV) CRACKED FACADEMASONRY BRICKS BETWEEN 4TH AND 10TH FLOOR. REMEDY: MAINTAIN EXTERIOR B
#35729670N
Aug 20, 2026
IN VIOLATION
$2,500
DOB (0)

None open.

DOB NOW Safety (22)
IssuedViolationStatus
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Mar 9, 2022Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Mar 9, 2022Facades FISPFCS
CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 30, 2026DOB SafetyAEUHAZ: Open
Aug 31, 2026ECBConstruction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-MAINTAIN VIOLATION #39177843P ISSUED 2/19/2026, CITING DAMAGED/REVERSED SPRINKLER HEADS, NO GAS SHUTOFF VALVE BEHIND GRILL, AND IMPROPERLYOpen
Aug 31, 2026ECBConstruction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-GROUND ELECTRICAL SYSTEMS VIOLATION #39177858H ISSUED 2/19/2026, CITING THE MAIN ELECTRICAL SYSTEM IN THE BASEMENT NOT GROUNDED TO THE MAINOpen
Aug 31, 2026ECBConstruction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-MAINTAIN VIOLATION #39177844R ISSUED 2/19/2026, CITING A WASTE LINE IN THE DEDICATED HIGH-VOLTAGE ELECTRICAL ROOM AND PIPES PENETRATING WALOpen
Aug 31, 2026ECBConstruction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-INSTALL GROUNDING VIOLATION #39177857X ISSUED 2/19/2026, CITING NO GROUNDING ELECTRODE/GROUND ROD INSTALLED IN THE BASEMENT MAIN ELECTRICALOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 12:07 PM ET. BBL 1000427501.

Look up another building