Manhattan · Block 1970 · Lot 42 · 10027

80 Convent Avenue

5 floors · 40,200 sq ft · built 1953 · class M9 · owner of record: Rc Chur Of Annunciati

33open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
68dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 68 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-17 (Accepted). Agency page

Dec 31, 2026
in 68 days
1 of 1 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 40,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing

Open violations

ECB / OATH (0)

None open.

DOB (9)
IssuedViolationStatus
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#01512
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#04121
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#04727
DOB VIOLATION - ACTIVE
Feb 19, 2002LOCAL LAW 10/81 - ELEVATOR

#01623
DOB VIOLATION - ACTIVE
Jan 20, 1999LOCAL LAW 10/81 - ELEVATOR

#01522
DOB VIOLATION - ACTIVE
May 31, 1994LOCAL LAW 10/81 - ELEVATOR

#01385
DOB VIOLATION - ACTIVE
Apr 7, 1992LOCAL LAW 10/81 - ELEVATOR
1
#01951
DOB VIOLATION - ACTIVE
Apr 25, 1991LOCAL LAW 10/81 - ELEVATOR
1
#01426
DOB VIOLATION - ACTIVE
Oct 12, 1989LOCAL LAW 10/81 - ELEVATOR
1
#02962
DOB VIOLATION - ACTIVE
DOB NOW Safety (24)
IssuedViolationStatus
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
May 20, 2019Elevators EVCAT5
Active
Apr 5, 2019Elevators EVCAT1
Active
Jan 3, 2017Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 19, 2002Elevators LL1081
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
Jan 20, 1999Elevators LL1081
Active
May 4, 1998Boiler LL6291
Active
May 31, 1994Elevators LL1081
Active
Apr 7, 1992Elevators LL1081
Active
Apr 25, 1991Elevators LL1081
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 10:43 PM ET. BBL 1019700042.

Look up another building