3 floors · 2 apartments · 3,480 sq ft · built 1931 · class S9 · owner of record: 80-17 Enterprises Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-20 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 11, 2012 | Construction CLASS - 1 B101. WEIL MCLAIN BOILER WAS INSTALLED W/O PERMITS OR FILING W/NYC DOB. A.O. SMITH HOT WATER HEATER WAS INSTALLED W/O PERMITS OR FILING. #32072392J | Mar 19, 2013 IN VIOLATION | $0 |
| Sep 11, 2012 | Boilers CLASS - 2 36,50,50A. 50- MANUAL RESET LOW WATER CUT OFF MISSING. 50A- SAFETY RELIEF VALVE NOT PIPED DOWN TOWARD RE GROUND FUEL OIL TANK WAS NOT PROPERLY DISCONNECTED FROM REMOVE OIL LINE IN BASEMENT. #32072391H | Oct 30, 2012 STIPULATION/IN-VIO | $0 |
| Oct 19, 2006 | Construction Non-Hazardous WORK W/O A PERMIT. WORK NOTED:CONSTRUCTION OF HANG CEILING,FINISH & UNFINISH PARTITION WALL & 2 PC BATHROOM CREATING A 2ND BATHROOM AT FIRSTFL. NOTED:CEILING IMPROPERLY HANG W/ WIRE. #34541686R | Feb 21, 2007 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 2, 2013 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00799 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 2, 2013 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 11:01 PM ET. BBL 4011760037.