2 floors · 17,806 sq ft · built 1925 · class K2 · owner of record: Gwy Realty Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-09-12 (Accepted). Agency page | Dec 31, 2026 in 70 days | 1 of 1 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 30, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER FOR 39184137N. OBSERVED AT EXP 1 (BROADWAY) MASONRY FACADE STILL HAVE MISSING/DETERIORATING MORTAR JOINTS ABOVE THE RETAIL STORES AND PRE-K SCHOOL., REPAIR #39198488M | May 11, 2027 PENDING | $6,250 |
| Apr 10, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER : NOTED MISSING & DETERIORATING MORTAR JOINTS BETWEEN BRICK AT EXPOSURE # 1 . INCLUDING MISSING & DETERIORATING MORTAR JOINTS AT EXPOSURE # 4 ON PILLAR COLU #39184137N | Jun 16, 2026 IN VIOLATION | $0 |
| May 19, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED ROOF FAILLEVEL MASONRY CHINMNEY HAS DETERIORATING MORTAR JOINTS, SHIFTED BRICK SEVERAL TOP BRICKS MISSING AND CRUMBLING CEMENT ALL AROUND. EXP #1 AND #35720031X | Feb 1, 2027 DEFAULT | $6,250 |
| May 4, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER NOTED:AT 2ND FL MAINENTRY DOOR IN DISREPAIR/RACKED ALSO REAR EXIT DOOR AT STREET/TO STREETW/HAVING NO SELF CLOSER INSTALLED.REMEDY:REPAIR &/OR REPLACE. #35561128R | Oct 12, 2021 IN VIOLATION | $0 |
| May 4, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER USE OF PROHIBITED DOOR &/OR HARDWARE PER BC1008.18/27.371;NOTED:AT 2ND FL UPK INSTALLED KICK DOOR STOPPERS & HOOK STOPPERS THROUGHOUT ENTIRE LEVEL.REMEDY:PROVID #35561129Z | Oct 12, 2021 IN VIOLATION | $0 |
| May 4, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER ILLUMINATION FOR EXITS,EXITS DISCHARGES & PUBLIC CORRIDORS PER BC1006.1,27-381 NOTED:AT 2ND FL UPR EMERGENCY LIGHTS WERE NON OPERATIONAL THROUGHTOUT IN VARIOUS #35561130X | Oct 12, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 10, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER : NOTED MISSING & DETERIORATING MORTAR JOINTS BETWEEN BRICK AT EXP #1 . INCLUDING MISSING & DETERIORATING MORTAR JOINTS AT EXP # 4 ON PILLAR COLUMN ADJOINING FIRE ESCAPE ON ROOF . EXP # 2 SHOWING SIGNS OF STEP CRACKS, PARTIAL CAVE IN, & SEPARATIO #26-01018 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #16612 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #15640 | DOB VIOLATION - ACTIVE |
| Dec 3, 2009 | CONSTRUCTION #0401TB | DOB VIOLATION - ACTIVE |
| Oct 30, 2009 | CONSTRUCTION #0401B | DOB VIOLATION - ACTIVE |
| May 23, 2008 | CONSTRUCTION #STF100MS | DOB VIOLATION - ACTIVE |
| Oct 29, 2007 | CONSTRUCTION #0401VZ | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER FOR 39184137N. OBSERVED AT EXP 1 (BROADWAY) MASONRY FACADE STILL HAVE MISSING/DETERIORATING MORTAR JOINTS ABOVE THE RETAIL STORES AND PRE-K SCHOOL., REPAIR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 10:26 PM ET. BBL 4015090001.