5 floors · 20 apartments · 11,180 sq ft · built 1920 · class C6 · owner of record: 8 West 119 Street Housing Development Fund Corporation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-13 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 10, 2008 | Unknown CLASS - 2 WORK W/O A PERMIT WORK NOTED AT 1ST FL EXPOSURE 3 APT 3 2 ERECTED FULL HEIGHT PARTITIONS INSTALL FIRE RATED MATERIAL WORK 100% COMPLETE REMEDY: OBTAIN PERMIT OR RESTORE TO PRIOR CONDITIONS #34740615L | Jan 29, 2009 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #00768 | DOB VIOLATION - ACTIVE |
| Dec 2, 2008 | CONSTRUCTION #1002WW | DOB VIOLATION - ACTIVE |
| Oct 30, 2008 | CONSTRUCTION #1002DB | DOB VIOLATION - ACTIVE |
| Oct 6, 2007 | CONSTRUCTION #ER02MR | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 21, 2026 | C | Apt 5 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 16, 2026 |
| Oct 21, 2026 | A | Apt 5 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK WEST WALL IN THE KITCHEN LOCATED AT APT 5, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Sep 2, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CORNICE AT BUILDING FRONT | Oct 7, 2025 |
| Apr 11, 2011 | C | Apt 12A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 12A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 7, 2011 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK WEST WALL IN THE KITCHEN LOCATED AT APT 5, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 2:28 AM ET. BBL 1017170041.