Brooklyn · Block 1716 · Lot 33 · 11205

8 Walworth Street

1 floors · 3,910 sq ft · built 1982 · class E1 · owner of record: Toldos Yehudah, Llc

3open violations
$8,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
792dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 792 days
Next cycle year 2028

Open violations

ECB / OATH (3) · $8,750 owed
IssuedViolationHearingBalance
Sep 10, 2026Unknown CLASS - 2
ACTIVE SITE DURING DRIVING PILE OPERATIONS. EXCAVATION MORE THAN 8 FT DEEP, OBSERVED PILE CASINGS STORED AT LEADING EDGE OF THE EXCAVATION ON EXCAVATED SOIL CONTRARY TO CODE 3304.4.5. CREATING A COLLAPSE HAZARD
#39558996P
Nov 18, 2026
PENDING
$2,500
Sep 10, 2026Construction CLASS - 2
ACTIVE SITE DURING DRIVING PILE OPERATIONS. OBSERVED EXCAVATION MORE THAN 8 FT DEEP WITH HEAVY MACHINERY, UPON REQUEST FOR PRECONSTRUCTION SURVEY AND MONITORING REPORT AS REQUIRED BY 3309.4.3 AND 3309.4.4 NONE
#39558995N
Nov 18, 2026
PENDING
$1,250
Jul 31, 2026Unknown CLASS - 1
BC 3301.1.2 1-STORY BUILDING UNDERGOING VERTICAL AND HORIZONTAL ENLARGEMENT INTO A 4-STORY BUILDING, 8 FLAMMABLE LP GAS (PROPANE) TANK WAS UNSAFELY STORED IN AN UNSECURED CAGE WITH NO LOCK CONTRARY TO FIRE COD
#39557377L
Dec 9, 2026
$5,000
DOB (1)
IssuedViolationStatus
May 11, 2026CONSTRUCTION
BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT# B01325801-I1 ON 3/6/26. CONTRACTOR WITHDRAWAL
#26-01277
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 10, 2026ECBUnknown: ACTIVE SITE DURING DRIVING PILE OPERATIONS. EXCAVATION MORE THAN 8 FT DEEP, OBSERVED PILE CASINGS STORED AT LEADING EDGE OF THE EXCAVATION ON EXCAVATED SOIL CONTRARY TO CODE 3304.4.5. CREATING A COLLAPSE HAZARDOpen
Sep 10, 2026ECBConstruction: ACTIVE SITE DURING DRIVING PILE OPERATIONS. OBSERVED EXCAVATION MORE THAN 8 FT DEEP WITH HEAVY MACHINERY, UPON REQUEST FOR PRECONSTRUCTION SURVEY AND MONITORING REPORT AS REQUIRED BY 3309.4.3 AND 3309.4.4 NONEOpen
Jul 31, 2026ECBUnknown: BC 3301.1.2 1-STORY BUILDING UNDERGOING VERTICAL AND HORIZONTAL ENLARGEMENT INTO A 4-STORY BUILDING, 8 FLAMMABLE LP GAS (PROPANE) TANK WAS UNSAFELY STORED IN AN UNSECURED CAGE WITH NO LOCK CONTRARY TO FIRE CODClosed
Jul 29, 2026ECBConstruction: AT THE TIME OF INSPECTION I OBSERVED MAJOR EXCAVATION ONGOING APROX 20FEET WIDEX40FEET LONG-APROX.8 FEET DEEP AT EXP#3-UPON REVIEWING THE PLANS PAGE 200.02- IT CALLS FOR RAKERS TO BE INSTALLED PRIOR TO EXCAVATIClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 3:42 AM ET. BBL 3017160033.