Manhattan · Block 10 · Lot 33 · 10004

8 Stone Street

43 floors · 143,731 sq ft · built 2007 · class H2 · owner of record: Cre Holdings Sub 1 Llc

27open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
66dto Annual boiler inspection (3 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-12-04 (Accepted). Agency page

Dec 31, 2026
in 66 days
3 of 3 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 143,731 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 10). Agency page

Dec 31, 2030
in 1527 days
Next due 2030
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $8,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: UNSAFE (2025-12-30)

Open violations

ECB / OATH (5)
IssuedViolationHearingBalance
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #914914. REMEDY: FILE ACCEPTABLE REPORT.
#37026787Z
May 2, 2024
IN VIOLATION
$0
Jul 7, 2022Unknown CLASS - 2
ELECTRIC WORK WITHOUT PERMIT. NOTED, POWER SUPPLY AND LUMINOUS IN WALK IN REFRIGERATOR WITHOUT PERMIT AT EXPOSURE #3 OUTSIDE THE RESTAURANT., OBTAIN PERMIT
#39065557H
Aug 25, 2022
IN VIOLATION
$0
Jul 7, 2022Construction CLASS - 2
WORK WITHOUT PERMIT. NOTED, ILLEGAL TWO WALK-IN REFRIGERATORS 8X10 FEET OUTSIDE THE RESTAURANT AT EXPOSURE # 3. NO PERMITS ISSUED FOR INSTALLING THOSE REFRIGERATORS . ECB VIOLATION ISSUED., OBTAIN ALL PERMITS
#39065556X
Nov 3, 2022
IN VIOLATION
$0
Sep 9, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATION #35249497X ISSUED ON 08/03/2017., FILE A CERTIFICATE OF CORRECTION
#39009123Y
Jan 23, 2020
IN VIOLATION
$0
Aug 3, 2017Construction CLASS - 2
WORK W/OUT A PERMIT. NOTED: @ REAR YARD ON GROUND LEVEL OBSERVED 2 WALK-IN REFRIGERATORS WERE BUILT W/OUT PERMIT. SIZE OF 1ST REF APPROX: 12'L X 10'W X 10'H. SIZE OF 2ND REP APPROX: 14'L X 8'W X 10'H. 100% OF W
#35249497X
Sep 21, 2017
ADMIT/IN-VIO
$0
DOB (7)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05290
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05292
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05291
DOB VIOLATION - ACTIVE
Nov 1, 2023FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
FAILURE TO CORRECT SWARMP CONDITIONS
#00183
DOB VIOLATION - ACTIVE
Apr 20, 2023HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#911051
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00041
DOB VIOLATION - ACTIVE
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2100004
DOB VIOLATION - ACTIVE
DOB NOW Safety (15)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Nov 1, 2023Facades FISPFCS
CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Apr 20, 2023Facades FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 6:30 AM ET. BBL 1000100033.