6 floors · 13 apartments · 6,253 sq ft · built 2025 · class D3 · owner of record: 6 Havemeyer Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 19, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOSURE 1 CONTRARY TO CODE 3307.6.4.4 VERTICAL MEMBERS AND BEAMS. ACTIVE DRIVEWAY AT EXPOS 2 VERTICAL MEMBERS WERE NOT PROTECTED FROM DISPLACEMENT WITH K #39560768X | Dec 23, 2026 PENDING | $2,400 |
| Oct 19, 2026 | Unknown CLASS - 2 UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED A FLOOR OPENING ON THE 6TH INADEQUATELY COVERED. HOLE COVERING WAS NOT SECURED, 2IN THICK AND WAS NOT CLEARLY MARKED AS PER CODE 3306.9.10.3 #39560769H | Dec 23, 2026 PENDING | $2,500 |
| Oct 19, 2026 | Site Safety CLASS - 1 UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED EMBEDDED SAFETY STRAPS INSTALLED ON EVERY FLOOR IN USE. UPON REQUEST TO SEE THE INSTALLATION PHOTOS AND MAINTENANCE LOG (DOCS TO BE KEPT AND #39560747R | Dec 23, 2026 PENDING | $2,500 |
| Oct 19, 2026 | Construction CLASS - 2 I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH AN INADEQUATE FENCE PROJECT INFO PANEL INSTALLED. MISSING CONTENT REQUIRED BY CHAPTER 33 (CONTACT NUMBERS FOR THE OWNER AND GENERAL CONTRACTOR OF THE SITE, WEBSITE A #39560762P | Dec 23, 2026 PENDING | $1,250 |
| Oct 19, 2026 | Unknown CLASS - 2 UPON INSPECTION OF AN ACTIVE 6 STORY NB I OBSERVED A WINDOW AT EXPOSURE 3 WITH NO WINDOW PROTECTION PROVIDED CONTRARY TO CODE. INCOMPLETE AND ON GOING WORK WITHIN CLOSE PROXIMITY TO THE UNPROTECTED WINDOW IS A #39560745N | Dec 23, 2026 PENDING | $2,500 |
| Oct 19, 2026 | Construction CLASS - 1 I OBSERVED PIPE SCAFFOLD IN USE INSTALLED AT EXPOS 1, 2 AND 3 CONTRARY TO THE APPROVED DRAWINGS. NO DETAILS PROVIDED FOR 2FT PIPE SCAFFOLD USED AT EXPOS 3 ON THE 3RD FLR. PIPE SCAFFOLD BASE CONNECTION AT EXPOS #39560744L | Dec 23, 2026 PENDING | $2,500 |
| Oct 19, 2026 | Construction CLASS - 1 UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED INADEQUATE AND POTENTIALLY HAZARDOUS HOUSEKEEPING PRACTICES ON THE 1ST FLOOR AT EXPOS 1. I OBSERVED ACCUMULATED COMBUSTIBLE MATERIAL AND DEBR #39560756Z | Dec 23, 2026 PENDING | $2,500 |
| May 13, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION ON A NON ACTIVE JOB SITE, I OBSERVED CONSTRUCTION FENCE AROUND PERIMETER OF SITE COVER WITH EXCESSIVE GRAFFITI AND POSTERS UNRELATED CONSTRUCTION MATERIAL . #39554068Y | Feb 2, 2027 | $1,000 |
| May 13, 2026 | Unknown CLASS - 2 NO WATCHPERSON BC 3303.3 AT THE TIME OF INSPECTION ON NON ACTIVE JOB SITE UNDER CONSTRUCTION APPROXIMATELY 5,409 SQUARE FEET. SITE WAS CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY UPON SHOUTING AND BANGING O #39554069X | Feb 2, 2027 | $2,500 |
| Mar 6, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.AT TIME OF INSPECTION,CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#395 #39551358Z | Dec 18, 2026 | $1,250 |
| Jan 6, 2026 | Unknown CLASS - 1 BC 3310.4-SITE SAFETY MONITORING PROGRAM-OBSERVED ACTIVE 7 STORY 75' HIGH NEW BUILDING CONSTRUCTION JOB SITE ONLY CS DESIGNATED-AFTER REVIEWING DOB RECORDS PERMIT ISSUED ON 12/12/25-AS THE BUILDING IS PROPOSED #39548839M | Oct 23, 2026 | $5,000 |
| Jan 6, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF ACTIVE CONSTRUCTION JOB SITE OBSERVED SIDEWALK SHEDS INSTALLED AT EXP#1 -UPON ASKING COMPETENT PERSON FOR DAILY MAINTENANCE LOGS FOR SHED -NO ENTRY FOR INSPECTION OF SHED RECORDE #39548784Y | Oct 23, 2026 | $1,250 |
| Aug 21, 2025 | Construction CLASS - 2 PROPOSED 8 STORIES NEW BUILDING CURRENTLY AT 3 STORIES AFTER REVIEW OF BIS AND DEPARTMENT OF BUILDINGS (DOB) SYSTEM RECORDS CONFIRMED THAT NO NEW BUILDING PERMIT HAD BEEN OBTAINED FOR ONGOING CONSTRUCTION WORK #39543943J | Jan 15, 2027 | $1,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | ECB | Construction: UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOSURE 1 CONTRARY TO CODE 3307.6.4.4 VERTICAL MEMBERS AND BEAMS. ACTIVE DRIVEWAY AT EXPOS 2 VERTICAL MEMBERS WERE NOT PROTECTED FROM DISPLACEMENT WITH K | Open |
| Oct 19, 2026 | ECB | Unknown: UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED A FLOOR OPENING ON THE 6TH INADEQUATELY COVERED. HOLE COVERING WAS NOT SECURED, 2IN THICK AND WAS NOT CLEARLY MARKED AS PER CODE 3306.9.10.3 | Open |
| Oct 19, 2026 | ECB | Site Safety: UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED EMBEDDED SAFETY STRAPS INSTALLED ON EVERY FLOOR IN USE. UPON REQUEST TO SEE THE INSTALLATION PHOTOS AND MAINTENANCE LOG (DOCS TO BE KEPT AND | Open |
| Oct 19, 2026 | ECB | Construction: I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH AN INADEQUATE FENCE PROJECT INFO PANEL INSTALLED. MISSING CONTENT REQUIRED BY CHAPTER 33 (CONTACT NUMBERS FOR THE OWNER AND GENERAL CONTRACTOR OF THE SITE, WEBSITE A | Open |
| Oct 19, 2026 | ECB | Unknown: UPON INSPECTION OF AN ACTIVE 6 STORY NB I OBSERVED A WINDOW AT EXPOSURE 3 WITH NO WINDOW PROTECTION PROVIDED CONTRARY TO CODE. INCOMPLETE AND ON GOING WORK WITHIN CLOSE PROXIMITY TO THE UNPROTECTED WINDOW IS A | Open |
| Oct 19, 2026 | ECB | Construction: I OBSERVED PIPE SCAFFOLD IN USE INSTALLED AT EXPOS 1, 2 AND 3 CONTRARY TO THE APPROVED DRAWINGS. NO DETAILS PROVIDED FOR 2FT PIPE SCAFFOLD USED AT EXPOS 3 ON THE 3RD FLR. PIPE SCAFFOLD BASE CONNECTION AT EXPOS | Open |
| Oct 19, 2026 | ECB | Construction: UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED INADEQUATE AND POTENTIALLY HAZARDOUS HOUSEKEEPING PRACTICES ON THE 1ST FLOOR AT EXPOS 1. I OBSERVED ACCUMULATED COMBUSTIBLE MATERIAL AND DEBR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 5:07 AM ET. BBL 3023140122.