Queens · Block 15736 · Lot 1 · 11691

8-21 Bay 25 Street

4 floors · 46,170 sq ft · built 1928 · class W1 · owner of record: Nyc Department Of Education

37open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
165dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 46,170 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 409 days
Next cycle year 2027
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-12 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (14)
IssuedViolationHearingBalance
Mar 31, 2026Construction CLASS - 2
EXIT DOORS NOT SELF-CLOSING. NOTED EXIT DOORS #14 AND #15 NOT SELF-CLOSING. REMEDY: REPAIR/REPLACE DOOR.
#35727390J
Apr 20, 2026
POP/IN-VIO
$0
Mar 31, 2026Construction CLASS - 2
REISSUE ECB #35677161N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED SEVERAL DOORS NOT SELF-CLOSING-ROOMS: 345, 330, 310M 250, AUDITORIUM, CAFETERIA, GYM, STAIR J, CORRIDOR BY #160, STAIR H. REME
#35727389M
Apr 20, 2026
POP/IN-VIO
$0
Mar 31, 2026Construction CLASS - 2
28-301.1. UNLAWFUL PLACEMENT OF FURNISHINGS, DECORATIONS OR OTHER OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO EGRESS FROM OR VISIBILITY THEREOF PER FDNY 2008 CODE; FC 1027.4. NOTED EGRESS FROM AUDITORIUM PAR
#35727391L
Apr 20, 2026
POP/IN-VIO
$0
Mar 31, 2026Construction CLASS - 2
REISSUED ECB #35691659L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED RETAINING WALL AROUND YARD STARTED CRACKING AND PARTS MISSING. REMEDY: REPAIR AND/OR REPLACE.
#35727386R
Apr 20, 2026
POP/IN-VIO
$0
Mar 31, 2026Construction CLASS - 2
REISSUED ECB #35691657H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORSPER BC 1006.1; 27-381. NOTED EMERGENCY LIGHTS NOT WORKING: UNITS 6, 7,
#35727388K
Apr 20, 2026
POP/IN-VIO
$0
Mar 31, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED BROKEN AND MISSING GLASS DOOR PANEL AT SMOKE DOOR BY STAIR -3RD FLOOR. ALSO WINDOW PANEL CRACKED ABOVE EXIT #11. REMEDY: REPAIR AND/OR REPLACE.
#35727392N
Apr 20, 2026
POP/IN-VIO
$0
Mar 31, 2026Construction CLASS - 2
REISSUE ECB #35691658J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED CRACKS STARTED ABOVE EXIT #16, PIECES OF DECORATIVE STONE MISSING. REMEDY: REPAIR AND/OR REPLACE.
#35727387Z
Apr 20, 2026
POP/IN-VIO
$0
Apr 1, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. EMG LIGHTS IN CORRIDOR BY 144, 145, 143, 142, 131, 111, 103M GYM STAIRS J 160, 250, 310, 330. REMEDY: REPAIR AND/OR REPLACE.
#35691656X
Apr 23, 2025
POP/IN-VIO
$0
Apr 1, 2025Construction CLASS - 2
REISSUE 35677159Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXIT. EXIT DISCHARGES AND PUBLIC CORRIDORS. EMG LIGHTS NOT WORKING. UNITS 6, 7, 9A, 13, 14, 15, 25, AND 32. REMEDY: REP
#35691657H
Apr 23, 2025
POP/IN-VIO
$0
Apr 1, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. CRACKS IN THE FACADE STARTED ABOVE EXIT IS AND ABOVE EXIT 16. REMEDY: REPAIR AND/OR REPLACE.
#35691658J
Apr 23, 2025
POP/IN-VIO
$0
Apr 1, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. RETAINING WALL AROUND YARD STARTED CRACKING AND PARTS MISSING. REMEDY: REPAIR AND/OR REPLACE.
#35691659L
Apr 23, 2025
POP/IN-VIO
$0
Apr 25, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT 3 FLOOR ROOM345, 330, 310, 2FL 250, AUDITORIUM BALCONY, 1FL 144, 145, 143, 142, 131, 111, 103, GYM STAIR J, CORRIDOR BY 160, AND AUDITORIUM ENTRANCE DOO
#35677161N
Aug 20, 2024
POP/IN-VIO
$0
Apr 25, 2024Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING. AT 3 FLOOR SMOKE DOORS, STAIR B BY 336, 345, 329, STAIR D BY 333, STAIR A BY 347, LIBRARY 7, 8 EXIT 1. 2FC. SMOKE STAIR J 221 STAIR A BY 230, 236, STAIR B BY 245, STAIR D BY BOY BATH
#35677160L
Aug 20, 2024
POP/IN-VIO
$0
Apr 25, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER; ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AY EMERGENCY LIGHTS BOX #6, 7, 9A, 13, 14, 15, 25 AND 32 ARE NOT FUNCTI
#35677159Y
Aug 20, 2024
POP/IN-VIO
$0
DOB (5)
IssuedViolationStatus
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#28827
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#28828
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#23238
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#23239
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#04141
DOB VIOLATION - ACTIVE
DOB NOW Safety (18)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 1:22 PM ET. BBL 4157360001.

Look up another building