3 floors · 3 apartments · 3,360 sq ft · built 1901 · class C0 · owner of record: Lafayette Estate Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 295 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 782 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 2, 2026 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING PROTECTIVE WIRE GLASS OVER THE SKYLIGHT AT CEILING AT PUBLIC HALL, 3rd STORY | Oct 7, 2026 |
| Sep 2, 2026 | A | D26-21.03 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS ON WALL AT OR NEAR STAIRS ALL STYS PUB HALL. | Dec 6, 2026 |
| Sep 2, 2026 | A | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING 40 WATT LIGHT BULB FIXTURE REAR OF BLDG. | Dec 6, 2026 |
| Sep 2, 2026 | B | D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSE ELECTRIAL WIRE ALL ROOMS 3 STY APT. | Oct 7, 2026 |
| Sep 2, 2026 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CLG THRU OUT 3 STY APT. | Dec 6, 2026 |
| Sep 2, 2026 | B | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS KITCHEN SINK 3 STY APT. | Oct 7, 2026 |
| Sep 2, 2026 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CLG 3 STY PUB HALL. | Dec 6, 2026 |
| Sep 2, 2026 | A | D26-12.03 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT REAR FIRE ESCAPE ALL STY. | Dec 6, 2026 |
| Sep 2, 2026 | B | Apt 3 · D26-10.01 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER 3 STY APT 3 ALL ROOMS. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING ELECTRIC LIGHT FIXTURE 3 STY APT 3 ALL ROOMS. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · D26-20.08,20.09 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING 3 STY APT 3. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS & WALLS 3 STY APT 3 THRU OUT. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS & WALLS 3 STY PUBLIC HALL BATHROOM. | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING 3 STY APT 3. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CEILING LIGHT FIXTURE 3 STY APT 3 FRONT WEST ROOM. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ENTRANCE TO 3 STY APT 3. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR 3 STY APT 3 BATHROOM. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ENTRANCE DOOR 3 STY APT 3 FRONT WEST ROOM. LOCATED AT APT 3 | Oct 7, 2026 |
| Sep 2, 2026 | C | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 2 STY APT 2 BATHROOM ER1. , SECTION '' '' | Sep 8, 2026 |
| Sep 2, 2026 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS THRU OUT 1 STY APT 2. , SECTION '' '' | Oct 7, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 2, 2026 | HPD B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING PROTECTIVE WIRE GLASS OVER THE SKYLIGHT AT CEILING AT PUBLIC HALL, 3rd STORY | Open |
| Sep 2, 2026 | HPD A | D26-21.03 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS ON WALL AT OR NEAR STAIRS ALL STYS PUB HALL. | Open |
| Sep 2, 2026 | HPD A | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING 40 WATT LIGHT BULB FIXTURE REAR OF BLDG. | Open |
| Sep 2, 2026 | HPD B | D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSE ELECTRIAL WIRE ALL ROOMS 3 STY APT. | Open |
| Sep 2, 2026 | HPD A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CLG THRU OUT 3 STY APT. | Open |
| Sep 2, 2026 | HPD B | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS KITCHEN SINK 3 STY APT. | Open |
| Sep 2, 2026 | HPD A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CLG 3 STY PUB HALL. | Open |
| Sep 2, 2026 | HPD A | D26-12.03 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT REAR FIRE ESCAPE ALL STY. | Open |
| Sep 2, 2026 | HPD B | D26-10.01 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER 3 STY APT 3 ALL ROOMS. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING ELECTRIC LIGHT FIXTURE 3 STY APT 3 ALL ROOMS. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | D26-20.08,20.09 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING 3 STY APT 3. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS & WALLS 3 STY APT 3 THRU OUT. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS & WALLS 3 STY PUBLIC HALL BATHROOM. | Open |
| Sep 2, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING 3 STY APT 3. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CEILING LIGHT FIXTURE 3 STY APT 3 FRONT WEST ROOM. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ENTRANCE TO 3 STY APT 3. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR 3 STY APT 3 BATHROOM. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ENTRANCE DOOR 3 STY APT 3 FRONT WEST ROOM. LOCATED AT APT 3 | Open |
| Sep 2, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 2 STY APT 2 BATHROOM ER1. , SECTION '' '' | Open |
| Sep 2, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS THRU OUT 1 STY APT 2. , SECTION '' '' | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 5:43 AM ET. BBL 3017920026.