| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 60 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-23 (Accepted). Agency page | Dec 31, 2026 in 60 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 23, 2018 | Construction CLASS - 1 B101, 50. VIOLATION CONDITION B101 #50-WEIL MCLAIN L6B SERIES Z BOILER INSTALLED W/O A PERMIT. ACQUIRE A PERMIT FOR THE INSTALLATION OF THE NEW BOILER AND SUBMIT A CERTIFICATE OF CORRECTION. #32092950N | Mar 19, 2018 ADMIT/IN-VIO | $0 |
| Jan 23, 2018 | Boilers CLASS - 2 B254,15,19,24,32A,34,50,36. VIOLATING CONDITIONS B254 #15 #19 NO COVERON CONTROL #24,#32A,#34,#36 AND #50 NO SPILL SWITCH. CORRECT VIOLATINGCONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTIONN. #32092951P | Mar 19, 2018 ADMIT/IN-VIO | $0 |
| Feb 18, 2016 | Construction CLASS - 3 FAIL TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTE:A LUMBER BUILT SUB-FLOORING @ VESTIBULE RAISED THE SURFACE OF ( )ON (APPL ) CREATING TRIPPING HAZARDOUS CONDITION AT HIGH TRAFFIC AREA.REM:REPAIR AND/OR REPL #35114460Y | Apr 4, 2016 ADMIT/IN-VIO | $0 |
| May 4, 2005 | Construction Hazardous FAILURE TO MAINTAIN BLDG-HAZARDOUS. DEFECT NOTED: DEFECTIVE ROOF COVERING, IS CAUSED THE WATER DAMAGE TO CEILINGS, JOISTS, PLASTER AT 3RD FLOOR APARTMENTS. ALSO NOTED: VERTICAL/HORIZONTAL CRACKS THRUOUT THE BLD #34474224P | Nov 9, 2005 WRITTEN OFF | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 27, 2026 | B | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Jun 1, 2026 |
| Dec 4, 2006 | A | Apt 2D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PATERTION ERECTED,CREATING ADDITION ROOM FOR LIVING. IN THE 2nd ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WE | Mar 14, 2007 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)