3 floors · 2 apartments · 3,135 sq ft · built 1920 · class S2 · owner of record: 7913 Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39158642P AS OF 7/28/2026., FILE A CERTIFICATE #39197957L | Nov 27, 2026 PENDING | $1,250 |
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39158644Z AS OF 7/28/2026., FILE A CERTIFICATE #39197964J | Nov 27, 2026 PENDING | $1,250 |
| Aug 27, 2025 | Construction CLASS - 1 WWP: AT THE TIME OF INSPECTION, OBSERVED FULL-HEIGHT PARTITION WALLS CONSTRUCTED TO SUBDIVIDE THE 2ND AND 3RD FLOORS INTO ADDITIONAL APARTMENTS NOT SHOWN ON APPROVED PLANS. DOB RECORDS INDICATE NO PERMITS ON FI #39158644Z | Dec 18, 2026 DEFAULT | $6,250 |
| Aug 27, 2025 | Construction CLASS - 1 FTM-LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1: AT THE TIME OF INSPECTION, OBSERVED 3-STORY MIXED-USE BUILDING WHERE 3RD FLOOR FRONT APARTMENT HAS NO SECONDARY MEANS OF EGRESS PROV #39158643R | Dec 18, 2026 DEFAULT | $12,500 |
| Aug 27, 2025 | Unknown CLASS - 2 RESIDENCE CONVERTED AND OCCUPIED AS A DWELLING FOR MORE FAMILIES THAN LEGALLY AUTHORIZED BY DEPARTMENT RECORDS: AT THE TIME OF INSPECTION, OBSERVED 2 ADDITIONAL DWELLING UNITS CREATED. ACCESS GAINED TO 3 APARTM #39158641N | Dec 18, 2026 DEFAULT | $10,000 |
| Aug 27, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT: AT THE TIME OF INSPECTION, OBSERVED AT THE 3RD FLOOR APARTMENT INSTALLATION OF AT LEAST ONE GAS STOVE REQUIRING NEW GAS PIPING. DOB RECORDS INDICATE NO PERMIT ON FILE. SUCH GAS WORK POSES #39158642P | Dec 18, 2026 DEFAULT | $25,000 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #14450 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #30259 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 28, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39158642P AS OF 7/28/2026., FILE A CERTIFICATE | Open |
| Jul 28, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39158644Z AS OF 7/28/2026., FILE A CERTIFICATE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:28 PM ET. BBL 3059810006.