3 floors · 1 apartments · 4,164 sq ft · built 1925 · class S1 · owner of record: Yousaf, Qaseem
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 41 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 285 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 772 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 16, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39140999M AS OF 3/16/2026., FILE A CERTIFICATE #39180611N | Jun 17, 2026 IN VIOLATION | $1,250 |
| Mar 16, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39087980M AS OF 3/16/2026., FILE A CERTIFICATE #39180607K | Jun 17, 2026 IN VIOLATION | $1,250 |
| Mar 10, 2025 | Construction CLASS - 1 NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 WORK WITHOUT A PERMIT VIOLATION #39087980M ISSUED ON 6/7/23 FOR WORK AT CELLAR LEVEL INCLUDING STRUCTURAL WORK, HVAC, AND ELECTRIC. PERMIT S00977291 ALLOWING FOR #39140989Z | Jun 18, 2025 IN VIOLATION | $2,500 |
| Mar 10, 2025 | Construction CLASS - 1 WORK AGAINST STOP WORK ORDER; OBSERVED WORK AT CELLAR LEVEL AND STAIRCASE LEADING TO CELLAR HAS BEEN APPROX 100% COMPLETED. OBSERVED THROUGH CELLAR WINDOW, SPACE IS FURNISHED WITH COUCH, CHAIRS AND BED. PERMIT #39140999M | Jun 18, 2025 IN VIOLATION | $10,000 |
| Jun 7, 2023 | Construction CLASS - 1 MAJOR ALTERATION AT CELLAR LEVEL WITH PLUMBING, ELECTRICAL, HVAC AND STRUCTURAL WORK ALL IN ABUNDANCE. NO PERMITS AT DOB FOR ANY OF THE WORK IN PROGRESS. VIOLATION FOR WWOP AND PARTIAL SWO ISSUED., OBTAIN PERMI #39087980M | Feb 13, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19690 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18263 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #38660 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #25626 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 20, 2026, 2:28 PM ET. BBL 5003770432.