4 floors · 72,000 sq ft · built 1939 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 72,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1423). Agency page | Dec 31, 2033 in 2625 days | Next due 2033 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-01 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 3RD FL LIBRARY RM 316 NOT INSTALLED/PROVIDED WITHOUT #35734532L | Jul 20, 2026 POP/IN-VIO | $0 |
| Jun 24, 2026 | Construction CLASS - 2 REISSUE ECB#35719910Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL AUDITORIUM 3RD FL GYM EMERGENCY LIGHT #35734530H | Jul 20, 2026 POP/IN-VIO | $0 |
| Jun 24, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING.NOTED:AT 1ST FL EXIT 6 IN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. #35734533N | Jul 20, 2026 POP/IN-VIO | $0 |
| Jun 24, 2026 | Construction CLASS - 2 REISSUE ECB#35719911X FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD LEFT AND RIGHT BOTH WITH CRACKS THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR REPLACE. #35734529K | Jul 20, 2026 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 REISSUE #35682787L DATE OF ISSUE: 06-07-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35719910Y | Jul 8, 2025 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 REISSUE #35682786J DATE OF ISSUE: 06-07-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER AT THE TIME OF INSPECTION OBSERVED AND NOTED AT ROOF LEVEL LEFT AND RIGHT CORNER WALL BY BULKHEAD EXITS RUNNIN #35719911X | Jul 8, 2025 POP/IN-VIO | $0 |
| Jun 7, 2024 | Construction CLASS - 2 REISSUE#35674649N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT TIME OF MY INSPECTION I OBSERVED THE EXIT SIGN AT EXIT #35682787L | Aug 14, 2024 POP/IN-VIO | $0 |
| Jun 7, 2024 | Construction CLASS - 2 REISSUE#35674950M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED AT THE ROOF LEVEL LEFT AND RIGHTCORNER WALL BY THE BULKHEAD EXITS RUNNING CRACK IN SEVERAL PLACES AT B #35682786J | Aug 14, 2024 POP/IN-VIO | $0 |
| Apr 13, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOF LEVEL LEFT & RIGHT CORNER WALL BY BULKHEAD EXITS RUNNING CRACKS IN SEVERAL PLACES AT BRIDGE ABOVE EXIT 6 BEAM HAS MISSING & SPALLING MASONRY I #35674950M | Jul 5, 2023 POP/IN-VIO | $0 |
| Apr 13, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1; 27-381.NOTED:EXIT SIGN AT EXIT 1 INOPERATIVE.REMEDY:REPAIR/REPLACE LIGHTING #35674649N | Jul 5, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09591 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #17216 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #20086 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #18345 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #18781 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #18782 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 6:23 PM ET. BBL 3014230014.