Queens · Block 2850 · Lot 41 · 11379

79-15 Eliot Avenue

1 floors · 10,000 sq ft · built 1950 · class K1 · owner of record: Food Connection Realty Llc

6open violations
$20,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1146dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1146 days
Next cycle year 2029

Open violations

ECB / OATH (4) · $20,000 owed
IssuedViolationHearingBalance
Oct 16, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 37025531K., FILE A CERTIFICATE OF CORRECTION
#39208235K
Dec 22, 2026
PENDING
$1,250
Aug 27, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ECB39149837K ISSUED 6/3/25 NO COMPLIANCE RECORDED FOR DOBVIO VIO23-01862, DATED 6/14/23. RESPONDENT WAS REQUIRED TO PROVIDE AND ENGINEERING REPORT FOR
#39202175K
Nov 10, 2026
PENDING
$12,500
Jun 3, 2025Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01862, DATED 06/14/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 06/03/2
#39149837K
Aug 4, 2026
IN VIOLATION
$6,250
Oct 11, 2023Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01862,DATED 6/14/23.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/23,AN ENGIN
#37025531K
Feb 7, 2025
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Jun 14, 2023CONSTRUCTION
STRUCTURE RENDERED NON COMPLAINT. OBSERVED AT EXPOSURE #4 KNEE WALL HAVE CRACKS, SHIFTED, 10 FEET IN HEIGHTS DECORATIVE BRICK COLUMN SHIFTED HAVE CRACKS AND SEPARATION APPROX 2 INCH, WINDOW GLASS OUT DUE VEHICLE STRIKES BUILDING.
#23-01861
DOB VIOLATION - ACTIVE
Jun 14, 2023CONSTRUCTION
OBSERVED AT EXPOSURE #4 KNEE WALL HAVE CRACKS, SHIFTED, 10 FEET IN HEIGHTS DECORATIVE BRICK COLUMN SHIFTED HAVE CRACKS AND SEPARATION APPROX 2 INCH, DUE VEHICLE STRIKES BUILDING.
#23-01862
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 16, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 37025531K., FILE A CERTIFICATE OF CORRECTIONOpen
Aug 27, 2026ECBConstruction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ECB39149837K ISSUED 6/3/25 NO COMPLIANCE RECORDED FOR DOBVIO VIO23-01862, DATED 6/14/23. RESPONDENT WAS REQUIRED TO PROVIDE AND ENGINEERING REPORT FOROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 1:13 PM ET. BBL 4028500041.

Look up another building