1 floors · 10,000 sq ft · built 1950 · class K1 · owner of record: Food Connection Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 16, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 37025531K., FILE A CERTIFICATE OF CORRECTION #39208235K | Dec 22, 2026 PENDING | $1,250 |
| Aug 27, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ECB39149837K ISSUED 6/3/25 NO COMPLIANCE RECORDED FOR DOBVIO VIO23-01862, DATED 6/14/23. RESPONDENT WAS REQUIRED TO PROVIDE AND ENGINEERING REPORT FOR #39202175K | Nov 10, 2026 PENDING | $12,500 |
| Jun 3, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01862, DATED 06/14/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 06/03/2 #39149837K | Aug 4, 2026 IN VIOLATION | $6,250 |
| Oct 11, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01862,DATED 6/14/23.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/23,AN ENGIN #37025531K | Feb 7, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 14, 2023 | CONSTRUCTION STRUCTURE RENDERED NON COMPLAINT. OBSERVED AT EXPOSURE #4 KNEE WALL HAVE CRACKS, SHIFTED, 10 FEET IN HEIGHTS DECORATIVE BRICK COLUMN SHIFTED HAVE CRACKS AND SEPARATION APPROX 2 INCH, WINDOW GLASS OUT DUE VEHICLE STRIKES BUILDING. #23-01861 | DOB VIOLATION - ACTIVE |
| Jun 14, 2023 | CONSTRUCTION OBSERVED AT EXPOSURE #4 KNEE WALL HAVE CRACKS, SHIFTED, 10 FEET IN HEIGHTS DECORATIVE BRICK COLUMN SHIFTED HAVE CRACKS AND SEPARATION APPROX 2 INCH, DUE VEHICLE STRIKES BUILDING. #23-01862 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 16, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 37025531K., FILE A CERTIFICATE OF CORRECTION | Open |
| Aug 27, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ECB39149837K ISSUED 6/3/25 NO COMPLIANCE RECORDED FOR DOBVIO VIO23-01862, DATED 6/14/23. RESPONDENT WAS REQUIRED TO PROVIDE AND ENGINEERING REPORT FOR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 1:13 PM ET. BBL 4028500041.