Queens · Block 1279 · Lot 1 · 11372

79-06 35 Avenue

6 floors · 96 apartments · 95,000 sq ft · built 1952 · class D1 · owner of record: Qlq Corp

26open violations
$0ECB/OATH penalties owed
8HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 95,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 796 days
Next cycle year 2028
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1279). Agency page

Dec 31, 2029
in 1161 days
Next due 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-28 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00569
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#29982
DOB VIOLATION - ACTIVE
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
#00704
DOB VIOLATION - ACTIVE
Jan 19, 2006LANDMARK

#06-0363
DOB VIOLATION - ACTIVE
Dec 31, 2002LANDMARK

#03-0552
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 22, 2023Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (17) · C 8 · B 7 · A 2
IssuedClassViolationCorrect by
Oct 20, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR IS LOCKED AT BASEMENT STORY AT BOILER ROOMOct 26, 2026
Oct 19, 2026CApt 4E · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''79-10''Oct 19, 2026
Oct 5, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT CELLAR AT BOILER ROOMOct 11, 2026
Oct 5, 2026CApt 4E · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 5, 2026
Jul 1, 2026AApt 1A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Oct 4, 2026
Jul 1, 2026CApt 1A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Jul 27, 2026
Jul 1, 2026CApt 1A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Jul 27, 2026
Jul 1, 2026AApt 1A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Oct 4, 2026
Jul 1, 2026CApt 4G · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''79-10''Jul 7, 2026
Jun 15, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR IS LOCKED AT BASEMENT STORY AT BOILER ROOMJun 21, 2026
Oct 15, 2024B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK CEILING AND WEST WALL AT 1st PUBLIC HALL BULKHEAD FROM EAST AT SOUTH, 6th STORYNov 19, 2024
Oct 15, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING AND ALL WALLS AT 1st PUBLIC HALL BULKHEAD FROM EAST AT SOUTH, 6th STORYNov 19, 2024
Oct 10, 2024B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND WEST WALL AT BULKHEAD AT PUBLIC HALL, 6th STORYNov 14, 2024
Oct 10, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND WEST WALL AT BULKHEAD AT PUBLIC HALL, 6th STORYNov 14, 2024
May 2, 2018BApt 1A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK WALLS AND CEILING. IN THE 1st BEDROOM FROM NORTH AT WEST LOCATED AT APT 1A, 1st STORY, APARTMENT AT WEST , SECTION ''79-10''Jun 6, 2018
May 2, 2018BApt 1A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING. IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, APARTMENT AT WEST , SECTION ''79-10''Jun 6, 2018
Nov 16, 2017BApt 5F · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHDec 21, 2017

Issued in the last 120 days

DateSourceWhatNow
Oct 20, 2026HPD C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR IS LOCKED AT BASEMENT STORY AT BOILER ROOMOpen
Oct 19, 2026HPD C§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''79-10''Open
Oct 5, 2026HPD C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT CELLAR AT BOILER ROOMOpen
Oct 5, 2026HPD C§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Jul 1, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT BULKHEAD , 6th STORY, SECTION ''79-10''Closed
Jul 1, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Open
Jul 1, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''79-10''Closed
Jul 1, 2026HPD A§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Jul 1, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Jul 1, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT BULKHEAD , 6th STORY, SECTION ''79-10''Closed
Jul 1, 2026HPD C§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 1M, 1st STORY, 2nd APAClosed
Jul 1, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTClosed
Jul 1, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''79-10''Closed
Jul 1, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''79-10''Closed
Jul 1, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Open
Jul 1, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Open
Jul 1, 2026HPD A§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''79-10''Open
Jul 1, 2026HPD C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''79-10''Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 7:30 AM ET. BBL 4012790001.

Look up another building