7 floors · 215 apartments · 88,000 sq ft · built 1963 · class H9 · owner of record: 7900 Development Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-10 (Accepted). Agency page | Dec 31, 2026 in 68 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 88,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $139,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 851 days | Filing window not open yet |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2453). Agency page | Dec 31, 2033 in 2625 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 5, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39185884L., FILE A CERTIFICATE OF CORRECTION #39206800P | Dec 15, 2026 PENDING | $1,250 |
| Apr 23, 2026 | Construction CLASS - 1 OBSERVED AT TIME OF INSPECTION 2 BOILERS NOT WORKING DUE TO CRACKED HEAT TUBES. TENANTS HAVE NO HOT WATER OR HEAT. PER BC 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER., REPAIR AND/REPLACE #39185884L | Jun 30, 2026 DEFAULT | $12,500 |
| Feb 9, 2026 | Boilers CLASS - 1 FOUND FEDERAL MODEL FST150 OIL FIRED BOILER CEASED USED DUE TO HAZARDOUS CONDITION. (COMBUSTION CHAMBER FULL OF WATER) DO NOT OPERATE BOILER UNTIL ALL HAZARDOUS CONDITIONS ARE IMMEDIATELY CORRECTED AND DOB IS N #39176516N | Apr 21, 2026 ADMIT/IN-VIO | $0 |
| Dec 5, 2025 | Construction CLASS - 2 OBSERVED FIRE DEPARTMENT CONNECTION LACKING CLEARANCES, INADEQUATE SPRINKLER COVERAGE THROUGH THE BUILDING, UNPROTECTED STANDPIPE THREADS AND IMPROPER INSTALLED SPRINKLER HEADS 4TH FLOOR. VENT TERMINALS IS NOT #39169493Y | Aug 18, 2026 IN VIOLATION | $1,250 |
| Apr 2, 2025 | Elevators CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. UPON INSPECTION, THE DEVICE IN A FAMILY SHELTER, WITH 216 DWELLING UNITS AND 600 - 700 RESIDENTS AT ANY GIVEN TIME, IS FOUND TO BE OUT OF SERVICE. REMEDY: #39143614X | Feb 10, 2026 IN VIOLATION | $0 |
| Feb 25, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. OBSERVED NON SELF CLOSING DOORS THROUGHOUT BUILDING. POTENTIAL FIRE HAZARD., REPAIR/REPLACE DOOR #39139515Z | Jun 16, 2026 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| Mar 9, 2026 | C | Apt 504 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE KITCHENETTE LOCATED AT B-ROOM 504, 5th STORY, 5th B-ROOM FROM EAST AT SOUTH | Mar 15, 2026 |
| Jan 6, 2026 | C | Apt 618 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST LOCATED AT APT 618, 6th STORY, 12th APARTMENT FROM NORTH AT EAST | Jan 6, 2026 |
| Oct 14, 2025 | C | Apt 625 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHENETTE LOCATED AT B-ROOM 625, 6th STORY, 5th B-ROOM FROM WEST AT NORTH , SECTION ''620-637'' | Oct 14, 2025 |
| Jun 12, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 15, 2025 |
| Dec 17, 2024 | C | Apt 525 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Dec 21, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 5, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39185884L., FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 10:14 AM ET. BBL 4024530040.