2 floors · 12,466 sq ft · built 1930 · class M9 · owner of record: Yeshivas Nehardue Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 25, 2025 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FAILED TO COMPLY WITH COMMISSIONERS ORDER TO OBTAIN A CERTIFICATE OF CORRECTION FOR CLASS 1 WORK WITHOUT PERMIT VIOLATION #39127255N ISSUED ON 10/10/2 #39139453M | Aug 6, 2025 IN VIOLATION | $2,500 |
| Feb 25, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS; NO CERTIFICATE OF CORRECTION SUBMITTED TO DEPARTMENT FOR CLASS 1 VIOLATION #39127254L ISSUED #39139452K | Aug 6, 2025 IN VIOLATION | $1,250 |
| Oct 10, 2024 | Construction CLASS - 1 OCCUPANCY CONTRARY TO C OF O OFFICES AT 1ST FLOOR WERE CREATED INTO SLEEPING QUARTERS, DISCONTINUE ILLEGAL OCCUPANCY OR AMEND C OF O #39127254L | Jun 12, 2025 IN VIOLATION | $2,500 |
| Oct 10, 2024 | Construction CLASS - 1 PARTIAL STOP WORK ORDER FOR CELLAR LEVEL THEY ARE CREATING A RELIGIOUS BATH (IE SMALL POOLS ) FOR PRAYING., OBTAIN PERMIT #39127255N | Jun 12, 2025 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19666 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18235 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #43683 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #22838 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #18238 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #38433 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #25007 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #15859 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #19066 | DOB VIOLATION - ACTIVE |
| Jun 26, 2017 | CONSTRUCTION 2 STORY BLDG W/BOWSTRING TRUSS ROOF.WITHIN 60DAYS OF THIS VIO DATE, OWNER TO ENAGAGE NYS LIC PE EXP.W/WOOD TRUSSES TO PROBE & EVALUATE THE STRUCTURAL SOUDNESS OF BOWSTRING USING FIELD VERIFICATION, CALC.PROBES STRUCTURAL DEFICIENCIES TOBE IMMEDIATELY SHORED REPAIR, DRAWINGS TO BE FILED WITH DOB WITH #FEU50101JH | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #16236 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #14604 | DOB VIOLATION - ACTIVE |
| Sep 28, 2015 | CONSTRUCTION 1 STORY RETAIL BLDG W/A WOOD BOWSTRING TRUSS ROOF. REMEDY: W/IN 60DAYS OF DATE OF VIO OWNER TO ENGAGE A NYS LIC PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATION CALCULATIONS PROBES ETC & SUBMIT A REPORT ACCEPTABLE TO THE DEPT. RPR DWGS T/BE FILED W/TH #FEU50106JH | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #17737 | DOB VIOLATION - ACTIVE |
| Sep 20, 2014 | CONSTRUCTION FAIURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WARE- HOUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPARTMENT SERVED YOU WITH A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED #FEU0108WW | DOB VIOLATION - ACTIVE |
| Jun 30, 2014 | CONSTRUCTION THIS BUILDING HAS A WOOD BOWSTRING TRUSS ROOF BY 60 DAYS FROM VIOLATION, HAVE NYS LICENSED PE EVAL. EACH BOWSTRING TRUSS AND BEARINGS VIA FIELD VERIFICATION, CALCULATIONS, PROBES, ETC ANY STRUCTURAL DEFICIENCIES TO BE IMMEDIATELY SHORED. REPAIR DRAWINGS TO BE FILED WITH THE DOB WITHIN 45 DAYS AFTER #FEU50101JH | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
None open.