Manhattan · Block 1004 · Lot 20 · 10019

787 7 Avenue

51 floors · 1,633,544 sq ft · built 1985 · class O4 · owner of record: Fsp 787 Seventh, Llc

5open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
187dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 1,633,544 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1162 days
Next cycle year 2029
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1004). Agency page

Dec 31, 2034
in 2988 days
Next due 2034
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

On fileCycle 10 filing on record: SWARMP (2025-07-30)

Open violations

ECB / OATH (1) · $5,000 owed
IssuedViolationHearingBalance
Oct 15, 2024Zoning CLASS - 2
POPS SITE IS OPEN AND BEING UTILIZED BY THE PUBLIC. MARKET BAR AND GRILL HAS EXPANDED THEIR TABLES AND CHAIRS INTO THE POPS SPACE CONTRARY TO DCP AMENITIES LISTED., COMPLY WITH ZR
#39127930H
Apr 20, 2027
PENDING
$5,000
DOB (3)
IssuedViolationStatus
May 3, 2005ELEVATOR

#9011/128301
DOB VIOLATION - ACTIVE
Dec 18, 2001ELEVATOR
1P33053
#9444/446866
DOB VIOLATION - ACTIVE
Jan 27, 1999ELEVATOR
1F5514
#9444/102030
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 3:38 AM ET. BBL 1010040020.